A platform for research: civil engineering, architecture and urbanism
Road and bridge crack repairing structure and repairing method
The invention provides a road and bridge crack repairing structure and method. The road and bridge crack repairing structure comprises a base, a cleaning device, a sweeping device, a stirring device and a pressing device. A plurality of mounting columns are mounted at the lower end of the base, and universal wheels are mounted at the lower ends of the mounting columns; the cleaning device, the sweeping device, the stirring device and the pressing device are all mounted on the base; s1, field crack observation and detection; s2, surface cleaning; s3, cutting a V-shaped groove; s4, cleaning the V-shaped groove; s5, cleaning the V-shaped groove; s6, stirring the filling material; s7, repairing the cracks; the device is simple in structure, clear in method and convenient to use, the repairing efficiency is improved, the filling effect is ensured, cracks are cleaned, filling gaps generated during crack repairing are prevented, and the efficiency is improved.
本发明提供一种道路桥梁裂缝修复结构及修复方法:包括底座、清洗装置、清扫装置、搅拌装置、压紧装置;所述底座下端安装有多个安装柱,所述安装柱下端均安装有万向轮;所述清洗装置、清扫装置、搅拌装置、压紧装置均安装在所述底座上;S1:现场裂缝观察、检测;S2:表面清理;S3:切V型槽;S4:清洗V型槽;S5:清扫V型槽;S6:搅拌填充材料;S7:修补裂缝;本发明结构简单及方法明了,使用方便,加快修补的效率,确保填充效果,并对裂缝清洗,防止裂缝修补产生填充空隙,提高了效率。
Road and bridge crack repairing structure and repairing method
The invention provides a road and bridge crack repairing structure and method. The road and bridge crack repairing structure comprises a base, a cleaning device, a sweeping device, a stirring device and a pressing device. A plurality of mounting columns are mounted at the lower end of the base, and universal wheels are mounted at the lower ends of the mounting columns; the cleaning device, the sweeping device, the stirring device and the pressing device are all mounted on the base; s1, field crack observation and detection; s2, surface cleaning; s3, cutting a V-shaped groove; s4, cleaning the V-shaped groove; s5, cleaning the V-shaped groove; s6, stirring the filling material; s7, repairing the cracks; the device is simple in structure, clear in method and convenient to use, the repairing efficiency is improved, the filling effect is ensured, cracks are cleaned, filling gaps generated during crack repairing are prevented, and the efficiency is improved.
本发明提供一种道路桥梁裂缝修复结构及修复方法:包括底座、清洗装置、清扫装置、搅拌装置、压紧装置;所述底座下端安装有多个安装柱,所述安装柱下端均安装有万向轮;所述清洗装置、清扫装置、搅拌装置、压紧装置均安装在所述底座上;S1:现场裂缝观察、检测;S2:表面清理;S3:切V型槽;S4:清洗V型槽;S5:清扫V型槽;S6:搅拌填充材料;S7:修补裂缝;本发明结构简单及方法明了,使用方便,加快修补的效率,确保填充效果,并对裂缝清洗,防止裂缝修补产生填充空隙,提高了效率。
Road and bridge crack repairing structure and repairing method
一种道路桥梁裂缝修复结构及修复方法
HU YOUSHENG (author) / CHEN ZHAOHUA (author)
2022-10-21
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE