Floor water interception construction process
The invention discloses a floor water interception construction process, and relates to the technical field of building construction, the Nth floor is stipulated as a building main body structure construction layer, N is an integer greater than 5, and according to the construction sequence, the floor water interception construction process comprises the following two water interception modes: a sealing and blocking water interception mode: a blocking part comprises a floor reserved hole, a tower type material distributing machine opening and a pay-off hole; the drainage part comprises an elevator shaft, a balcony drainage pipe hole, a toilet drainage hole, stair flight steps, a stair rest platform and an outer wall surface; the sealing and blocking water interception mode comprises the following steps that floor reserved holes are blocked, wherein the floor reserved holes comprise a material conveying opening, a kitchen flue opening, a water and electricity well and an air shaft hole; blocking an opening of the tower-type material distributor; and plugging the pay-off hole. According to the construction method, a good construction dry operation environment can be provided for decoration engineering, mechanical and electrical installation and the like in a humid environment such as rainwater or structural construction water, the requirement for timely insertion of professional engineering can be met, and the construction efficiency is higher.
本申请公开一种楼层截水施工工艺,涉及建筑施工技术领域,规定第N层为建筑主体结构施工层,且N为大于5的整数,按照施工的先后顺序,包括以下两种截水模式:封堵截水模式:封堵部位包括楼层预留洞口、塔式布料机口、放线洞;引流截水模式:引流部位包括电梯井道、阳台排水管孔、卫生间排水孔、楼梯梯段踏步、楼梯休息平台、外墙面;封堵截水模式包括以下步骤:楼层预留洞口封堵,楼层预留洞口包括传料口、厨房烟道口、水电井、风井洞口;塔式布料机口封堵;放线洞封堵。本申请能够在雨水或结构施工用水等潮湿环境中,为装修工程、机电安装等提供良好的施工干作业环境,能够满足专业工程及时插入,施工效率更高。
Floor water interception construction process
The invention discloses a floor water interception construction process, and relates to the technical field of building construction, the Nth floor is stipulated as a building main body structure construction layer, N is an integer greater than 5, and according to the construction sequence, the floor water interception construction process comprises the following two water interception modes: a sealing and blocking water interception mode: a blocking part comprises a floor reserved hole, a tower type material distributing machine opening and a pay-off hole; the drainage part comprises an elevator shaft, a balcony drainage pipe hole, a toilet drainage hole, stair flight steps, a stair rest platform and an outer wall surface; the sealing and blocking water interception mode comprises the following steps that floor reserved holes are blocked, wherein the floor reserved holes comprise a material conveying opening, a kitchen flue opening, a water and electricity well and an air shaft hole; blocking an opening of the tower-type material distributor; and plugging the pay-off hole. According to the construction method, a good construction dry operation environment can be provided for decoration engineering, mechanical and electrical installation and the like in a humid environment such as rainwater or structural construction water, the requirement for timely insertion of professional engineering can be met, and the construction efficiency is higher.
本申请公开一种楼层截水施工工艺,涉及建筑施工技术领域,规定第N层为建筑主体结构施工层,且N为大于5的整数,按照施工的先后顺序,包括以下两种截水模式:封堵截水模式:封堵部位包括楼层预留洞口、塔式布料机口、放线洞;引流截水模式:引流部位包括电梯井道、阳台排水管孔、卫生间排水孔、楼梯梯段踏步、楼梯休息平台、外墙面;封堵截水模式包括以下步骤:楼层预留洞口封堵,楼层预留洞口包括传料口、厨房烟道口、水电井、风井洞口;塔式布料机口封堵;放线洞封堵。本申请能够在雨水或结构施工用水等潮湿环境中,为装修工程、机电安装等提供良好的施工干作业环境,能够满足专业工程及时插入,施工效率更高。
Floor water interception construction process
楼层截水施工工艺
HE SHIPIN (author) / LENG WEI (author) / HAN XUECHI (author) / HUANG DAOLOU (author) / JIA QI (author) / ZHANG JIAWEI (author) / LIU WENFENG (author) / ZHAO JUN (author) / ZHU TAO (author) / WU XIANGXING (author)
2022-10-21
Patent
Electronic Resource
Chinese
Full-crossing construction floor water interception system
European Patent Office | 2020
|European Patent Office | 2022
|Water pipe interception construction joint device and construction method thereof
European Patent Office | 2021
|Environment-friendly water conservancy interception dam and interception method
European Patent Office | 2021
|European Patent Office | 2022
|