A platform for research: civil engineering, architecture and urbanism
Early-dismantling supporting device for constructional engineering and implementation method
The early-dismantling supporting device comprises a base, a stand column, a bearing column and a supporting plate, the stand column is installed in the middle of the upper end of the base, and fixing bolts are installed at the four corners of the upper end of the base. The supporting device has the beneficial effects that through the design of the bearing column, the cross-shaped sliding block, the cross-shaped sliding groove and the lifting handle, the supporting device can have a convenient height adjusting function, the supporting device can be used for supporting formworks with different height requirements, and therefore the use flexibility of the supporting device is improved; according to the supporting device, an external wrench is not needed during screwing operation of the supporting device, so that the use convenience of the supporting device is improved, through the design of the stand column and the graduated scale, the supporting device can be provided with scales, a worker can accurately check the current supporting height in the operation process, and thus the use functionality of the supporting device is improved.
本发明公开了一种建筑工程早拆支撑装置及实施方法,包括底座、立柱、承载柱和支护板,所述底座上端中部安装有所述立柱,所述底座上端四角处均安装有固定栓。有益效果在于:通过设置承载柱、十字滑块、十字滑槽以及提柄的设计,能够使支撑装置具有便捷的高度调节功能,使支撑装置可以对不同高度需求的模板进行支柱,从而提高支撑装置的使用灵活性,通过设置螺杆、手轮以及连接杆的设计,能够使支撑装置在旋拧作业时无需借助外部扳手,从而提高支撑装置的使用便捷性,通过设置立柱以及刻度尺的设计,能够使支撑装置具有刻度,使工作人员在操作过程中可以精准的查看当前的支护高度,从而提高支撑装置的使用功能性。
Early-dismantling supporting device for constructional engineering and implementation method
The early-dismantling supporting device comprises a base, a stand column, a bearing column and a supporting plate, the stand column is installed in the middle of the upper end of the base, and fixing bolts are installed at the four corners of the upper end of the base. The supporting device has the beneficial effects that through the design of the bearing column, the cross-shaped sliding block, the cross-shaped sliding groove and the lifting handle, the supporting device can have a convenient height adjusting function, the supporting device can be used for supporting formworks with different height requirements, and therefore the use flexibility of the supporting device is improved; according to the supporting device, an external wrench is not needed during screwing operation of the supporting device, so that the use convenience of the supporting device is improved, through the design of the stand column and the graduated scale, the supporting device can be provided with scales, a worker can accurately check the current supporting height in the operation process, and thus the use functionality of the supporting device is improved.
本发明公开了一种建筑工程早拆支撑装置及实施方法,包括底座、立柱、承载柱和支护板,所述底座上端中部安装有所述立柱,所述底座上端四角处均安装有固定栓。有益效果在于:通过设置承载柱、十字滑块、十字滑槽以及提柄的设计,能够使支撑装置具有便捷的高度调节功能,使支撑装置可以对不同高度需求的模板进行支柱,从而提高支撑装置的使用灵活性,通过设置螺杆、手轮以及连接杆的设计,能够使支撑装置在旋拧作业时无需借助外部扳手,从而提高支撑装置的使用便捷性,通过设置立柱以及刻度尺的设计,能够使支撑装置具有刻度,使工作人员在操作过程中可以精准的查看当前的支护高度,从而提高支撑装置的使用功能性。
Early-dismantling supporting device for constructional engineering and implementation method
一种建筑工程早拆支撑装置及实施方法
GAO HONGFENG (author)
2022-10-21
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Early-dismantling supporting device for constructional engineering
European Patent Office | 2020
|Constructional engineering early-dismantling supporting equipment
European Patent Office | 2021
|Early-dismantling supporting device for constructional engineering and using method
European Patent Office | 2024
|Early-dismantling supporting device for constructional engineering and application method thereof
European Patent Office | 2021
|European Patent Office | 2024
|