The invention discloses a hole filling process for highway construction. The hole filling process comprises the following steps: S1, preparation work; the hole filling device is moved to the hole, the axis is in the center of the hole, filling materials are added into the containing cylinder, and the rotating shaft and the rotating rod rotate; s2, blanking is conducted; a threaded rod rotates, a threaded cylinder moves downwards, a locking rod pulls and breaks away from an L-shaped rod, a balancing weight moves downwards to extrude a wedge block, two baffles are away from each other, and a filling material falls into a hole; s3, the filled materials are flattened; the L-shaped rod descends, the fan-shaped parts on the balancing weight are meshed with the horizontal gear, the first shifting rod and the second shifting rod alternately push the L-shaped rod in two directions and swing in a reciprocating mode, the two fan-shaped gears drive the horizontal gear to rotate, and the pressing roller rotates in a reciprocating mode; s4, the materials on the compression roller are scraped off; the two baffles are far away from each other so that the two baffles can get close to the pressing roller, the adhered materials are scraped off, the pressing roller and the cam rotate, the asphalt is scraped off through the electric heating scraping block, and the asphalt is heated through heat and drips into holes.
本发明公开了一种公路建设孔洞填补工艺,包括以下步骤:S1准备工作;将本案采用的孔洞填补装置移动至孔洞上,轴线在孔洞的中心,将填补料加到容纳筒内,转轴和转杆转动;S2下料;蜗轮片转动物质向下输送,螺纹杆转动,螺纹筒向下运动锁定杆拉动并脱离L形杆接触,配重块向下运动挤压楔块,两个挡板远离,填补材料下落孔洞内;S3对填补的物料进行压平;L形杆下降,配重块上扇形与平齿轮啮合,第一、二拨杆交替双向推动L形杆,往复摆动,两个扇形齿轮带动平齿轮转动,压辊往复转动;S4将压辊上的物料刮下;两个挡板相互远离使两个挡板分别靠近压辊,粘附物料被刮下,压辊和凸轮转动,电加热刮块将沥青刮下,热量使沥青受热滴落到孔洞内。
Road construction hole filling process
The invention discloses a hole filling process for highway construction. The hole filling process comprises the following steps: S1, preparation work; the hole filling device is moved to the hole, the axis is in the center of the hole, filling materials are added into the containing cylinder, and the rotating shaft and the rotating rod rotate; s2, blanking is conducted; a threaded rod rotates, a threaded cylinder moves downwards, a locking rod pulls and breaks away from an L-shaped rod, a balancing weight moves downwards to extrude a wedge block, two baffles are away from each other, and a filling material falls into a hole; s3, the filled materials are flattened; the L-shaped rod descends, the fan-shaped parts on the balancing weight are meshed with the horizontal gear, the first shifting rod and the second shifting rod alternately push the L-shaped rod in two directions and swing in a reciprocating mode, the two fan-shaped gears drive the horizontal gear to rotate, and the pressing roller rotates in a reciprocating mode; s4, the materials on the compression roller are scraped off; the two baffles are far away from each other so that the two baffles can get close to the pressing roller, the adhered materials are scraped off, the pressing roller and the cam rotate, the asphalt is scraped off through the electric heating scraping block, and the asphalt is heated through heat and drips into holes.
本发明公开了一种公路建设孔洞填补工艺,包括以下步骤:S1准备工作;将本案采用的孔洞填补装置移动至孔洞上,轴线在孔洞的中心,将填补料加到容纳筒内,转轴和转杆转动;S2下料;蜗轮片转动物质向下输送,螺纹杆转动,螺纹筒向下运动锁定杆拉动并脱离L形杆接触,配重块向下运动挤压楔块,两个挡板远离,填补材料下落孔洞内;S3对填补的物料进行压平;L形杆下降,配重块上扇形与平齿轮啮合,第一、二拨杆交替双向推动L形杆,往复摆动,两个扇形齿轮带动平齿轮转动,压辊往复转动;S4将压辊上的物料刮下;两个挡板相互远离使两个挡板分别靠近压辊,粘附物料被刮下,压辊和凸轮转动,电加热刮块将沥青刮下,热量使沥青受热滴落到孔洞内。
Road construction hole filling process
公路建设孔洞填补工艺
ZHANG YANPENG (author) / LI WEIFENG (author) / LIU GUOCUI (author)
2022-10-25
Patent
Electronic Resource
Chinese