Construction method of double-wall steel sleeve box cofferdam of pebble riverbed
The invention provides a construction method of a double-wall steel cover box cofferdam of a pebble riverbed, which comprises the following steps: S1, setting a soil taking area and a slope gradient according to the position of a bearing platform, pre-excavating an underwater foundation pit according to the set soil taking area, and trimming the side slope and the base of the underwater foundation pit; s2, the double-wall steel sleeve box cofferdam is integrally lowered to the position above the underwater foundation pit so that the double-wall steel sleeve box cofferdam can float automatically; s3, an anchorage system is installed on the double-wall steel sleeve box cofferdam; s4, the double-wall steel cover box cofferdam rapidly sinks, and implantation is performed after fine positioning; s5, pile casing inserting and driving are conducted in the double-wall steel sleeve box cofferdam; and S6, bottom sealing construction is conducted in the double-wall steel sleeve box cofferdam. The method has the characteristics of high construction speed, safety and stability.
本发明提供一种卵石河床的双壁钢套箱围堰施工方法,包括:S1、根据承台位置设定取土区域和放坡坡度,根据设定的取土区域进行水下基坑预开挖,并修整所述水下基坑的边坡和基底;S2、整体下放双壁钢套箱围堰至所述水下基坑的上方使其自浮;S3、在所述双壁钢套箱围堰上安装锚碇系统;S4、使所述双壁钢套箱围堰快速下沉,精定位后着床;S5、在所述双壁钢套箱围堰的内部进行护筒插打;S6、在所述双壁钢套箱围堰的内部进行封底施工。本发明具有施工速度快,安全稳定的特点。
Construction method of double-wall steel sleeve box cofferdam of pebble riverbed
The invention provides a construction method of a double-wall steel cover box cofferdam of a pebble riverbed, which comprises the following steps: S1, setting a soil taking area and a slope gradient according to the position of a bearing platform, pre-excavating an underwater foundation pit according to the set soil taking area, and trimming the side slope and the base of the underwater foundation pit; s2, the double-wall steel sleeve box cofferdam is integrally lowered to the position above the underwater foundation pit so that the double-wall steel sleeve box cofferdam can float automatically; s3, an anchorage system is installed on the double-wall steel sleeve box cofferdam; s4, the double-wall steel cover box cofferdam rapidly sinks, and implantation is performed after fine positioning; s5, pile casing inserting and driving are conducted in the double-wall steel sleeve box cofferdam; and S6, bottom sealing construction is conducted in the double-wall steel sleeve box cofferdam. The method has the characteristics of high construction speed, safety and stability.
本发明提供一种卵石河床的双壁钢套箱围堰施工方法,包括:S1、根据承台位置设定取土区域和放坡坡度,根据设定的取土区域进行水下基坑预开挖,并修整所述水下基坑的边坡和基底;S2、整体下放双壁钢套箱围堰至所述水下基坑的上方使其自浮;S3、在所述双壁钢套箱围堰上安装锚碇系统;S4、使所述双壁钢套箱围堰快速下沉,精定位后着床;S5、在所述双壁钢套箱围堰的内部进行护筒插打;S6、在所述双壁钢套箱围堰的内部进行封底施工。本发明具有施工速度快,安全稳定的特点。
Construction method of double-wall steel sleeve box cofferdam of pebble riverbed
一种卵石河床的双壁钢套箱围堰施工方法
ZHANG YANG (author) / ZENG BICONG (author) / ZHOU SHENGLIN (author) / HUANG FENG (author) / ZHANG JINBEI (author) / ZHA BENYI (author) / WANG HUIJUAN (author) / PENG ZHILIN (author) / LUO ZHANQIANG (author) / LUO HUAN (author)
2022-10-25
Patent
Electronic Resource
Chinese
Complex riverbed steel sheet pile cofferdam and construction method
European Patent Office | 2024
|Combined cofferdam construction method under hard riverbed
European Patent Office | 2021
|Double-wall steel cofferdam structure construction method and double-wall steel cofferdam structure
European Patent Office | 2023
|Complex riverbed steel pipe pile combined cofferdam and construction method
European Patent Office | 2024
|European Patent Office | 2020
|