Protection and reinforcement construction method for high steep danger slope between high pier and abutment
The invention discloses a protection and reinforcement construction method for a high steep danger slope between a high pier and a bridge abutment. The protection and reinforcement construction method comprises the following steps that 1, construction preparation is conducted; step 2, surveying and setting out; 3, a solar ground disaster monitoring system (4) is arranged on the high steep danger slope (3); 4, slope surface danger removal is conducted on the high steep danger slope (3); 5, an anchor rod frame beam (5) is constructed, wherein the anchor rod frame beam (5) comprises a frame beam (51) and a low-prestress anchor rod (52); sixthly, grass is planted in the area of the frame beam (51) on the high steep dangerous slope (3) through soil replacement; 7, anchor cable piles (6) are constructed; and 8, a soil nailing wall (7) is constructed between every two adjacent anchor cable piles (6). Effective protection and reinforcement are formed on the high-steep-danger slope, scouring of river water to the lower structure of the bridge abutment and scouring of rainwater to the high-steep-danger slope can be reduced, and the overall stability of the high-steep-danger slope between the high pier and the bridge abutment can be improved.
本发明公开了一种高墩与桥台间高陡险坡的防护加固施工方法,包括以下步骤:步骤1:施工准备;步骤2:测量放线;步骤3:在高陡险坡(3)上布置太阳能地灾监测系统(4);步骤4:对高陡险坡(3)进行坡面清危;步骤5:施工锚杆框架梁(5),锚杆框架梁(5)包括框架梁(51)和低预应力锚杆(52);步骤6:在高陡险坡(3)上的框架梁(51)区域内客土植草;步骤7:锚索桩(6)施工;步骤8:在相邻两根锚索桩(6)间施工土钉墙(7)。本发明在高陡险坡上形成有效的防护加固,能减少河水对桥台下部结构冲刷及雨水对高陡险坡冲刷,可提高高墩与桥台间高陡险坡的整体稳定性。
Protection and reinforcement construction method for high steep danger slope between high pier and abutment
The invention discloses a protection and reinforcement construction method for a high steep danger slope between a high pier and a bridge abutment. The protection and reinforcement construction method comprises the following steps that 1, construction preparation is conducted; step 2, surveying and setting out; 3, a solar ground disaster monitoring system (4) is arranged on the high steep danger slope (3); 4, slope surface danger removal is conducted on the high steep danger slope (3); 5, an anchor rod frame beam (5) is constructed, wherein the anchor rod frame beam (5) comprises a frame beam (51) and a low-prestress anchor rod (52); sixthly, grass is planted in the area of the frame beam (51) on the high steep dangerous slope (3) through soil replacement; 7, anchor cable piles (6) are constructed; and 8, a soil nailing wall (7) is constructed between every two adjacent anchor cable piles (6). Effective protection and reinforcement are formed on the high-steep-danger slope, scouring of river water to the lower structure of the bridge abutment and scouring of rainwater to the high-steep-danger slope can be reduced, and the overall stability of the high-steep-danger slope between the high pier and the bridge abutment can be improved.
本发明公开了一种高墩与桥台间高陡险坡的防护加固施工方法,包括以下步骤:步骤1:施工准备;步骤2:测量放线;步骤3:在高陡险坡(3)上布置太阳能地灾监测系统(4);步骤4:对高陡险坡(3)进行坡面清危;步骤5:施工锚杆框架梁(5),锚杆框架梁(5)包括框架梁(51)和低预应力锚杆(52);步骤6:在高陡险坡(3)上的框架梁(51)区域内客土植草;步骤7:锚索桩(6)施工;步骤8:在相邻两根锚索桩(6)间施工土钉墙(7)。本发明在高陡险坡上形成有效的防护加固,能减少河水对桥台下部结构冲刷及雨水对高陡险坡冲刷,可提高高墩与桥台间高陡险坡的整体稳定性。
Protection and reinforcement construction method for high steep danger slope between high pier and abutment
高墩与桥台间高陡险坡的防护加固施工方法
LEI BO (author) / LIU ZHENQI (author) / SUN LIN (author) / LIU SHUAI (author) / WANG GANG (author) / HUANG JIXIANG (author) / WANG ZHENFU (author) / JIN LANG (author) / ZHANG SHENG (author)
2022-11-01
Patent
Electronic Resource
Chinese
Steep slope abutment structure with temporary anchorage and construction method
European Patent Office | 2024
|High and steep slope slab staggering soil retaining type bridge abutment and construction method
European Patent Office | 2024
|Bridge abutment high pier hydraulic creeping formwork construction method
European Patent Office | 2023
|Ecological slope protection structure for high and steep slope and construction method
European Patent Office | 2024
|