A platform for research: civil engineering, architecture and urbanism
Replaceable wind power anchor bolt assembly and construction method thereof
The invention discloses a replaceable wind power anchor bolt assembly which comprises a first coaming and a second coaming, built-in holes are formed in the first coaming and the second coaming, threaded anchor rods are arranged in the built-in holes in a sliding and sleeved mode, anti-disengaging blocks tightly attached to the first coaming are fixed to the threaded anchor rods, ends are fixed to the anti-disengaging blocks, and the ends are connected with the first coaming and the second coaming. The threaded anchor rod is provided with a first threaded sleeve tightly attached to the first surrounding plate, and the upper end and the lower end of the second surrounding plate are tightly attached to second threaded sleeves arranged on the threaded anchor rod in a threaded mode. The multiple threaded anchor rods are matched with the upper surrounding plate and the lower surrounding plate to form a stable anchor bolt cage structure, the threaded sleeves are in butt joint with the threaded anchor rods, the threaded anchor rods and the threaded sleeves are convenient to disassemble, through the half-and-half splicing structures of the surrounding plates, when a column body is arranged in the anchor bolt cage, half-and-half separation can be directly conducted in the later disassembling process, and the anchor bolt cage is convenient to disassemble. And the coaming can be conveniently recycled and reprocessed for use.
本发明公开了一种可更换的风电锚栓组合件,包括第一围板和第二围板,第一围板上和第二围板上均设置有内置孔,内置孔内滑动套设有螺纹锚杆,螺纹锚杆上固定有与第一围板紧贴的防脱块,防脱块上固定有端头,螺纹锚杆上设置有与第一围板紧贴的第一螺纹套,第二围板的上下两端均紧贴有与螺纹锚杆螺纹设置的第二螺纹套。本发明通过多根螺纹锚杆与上下两个围板的配合,形成一个稳定的锚栓笼结构,且采用螺纹套与螺纹锚杆对接,方便螺纹锚杆与螺纹套拆卸,通过围板的对半拼接结构,在锚栓笼内置有柱体时,可在后期拆卸过程中,直接对半分离,便于对围板的回收再加工使用。
Replaceable wind power anchor bolt assembly and construction method thereof
The invention discloses a replaceable wind power anchor bolt assembly which comprises a first coaming and a second coaming, built-in holes are formed in the first coaming and the second coaming, threaded anchor rods are arranged in the built-in holes in a sliding and sleeved mode, anti-disengaging blocks tightly attached to the first coaming are fixed to the threaded anchor rods, ends are fixed to the anti-disengaging blocks, and the ends are connected with the first coaming and the second coaming. The threaded anchor rod is provided with a first threaded sleeve tightly attached to the first surrounding plate, and the upper end and the lower end of the second surrounding plate are tightly attached to second threaded sleeves arranged on the threaded anchor rod in a threaded mode. The multiple threaded anchor rods are matched with the upper surrounding plate and the lower surrounding plate to form a stable anchor bolt cage structure, the threaded sleeves are in butt joint with the threaded anchor rods, the threaded anchor rods and the threaded sleeves are convenient to disassemble, through the half-and-half splicing structures of the surrounding plates, when a column body is arranged in the anchor bolt cage, half-and-half separation can be directly conducted in the later disassembling process, and the anchor bolt cage is convenient to disassemble. And the coaming can be conveniently recycled and reprocessed for use.
本发明公开了一种可更换的风电锚栓组合件,包括第一围板和第二围板,第一围板上和第二围板上均设置有内置孔,内置孔内滑动套设有螺纹锚杆,螺纹锚杆上固定有与第一围板紧贴的防脱块,防脱块上固定有端头,螺纹锚杆上设置有与第一围板紧贴的第一螺纹套,第二围板的上下两端均紧贴有与螺纹锚杆螺纹设置的第二螺纹套。本发明通过多根螺纹锚杆与上下两个围板的配合,形成一个稳定的锚栓笼结构,且采用螺纹套与螺纹锚杆对接,方便螺纹锚杆与螺纹套拆卸,通过围板的对半拼接结构,在锚栓笼内置有柱体时,可在后期拆卸过程中,直接对半分离,便于对围板的回收再加工使用。
Replaceable wind power anchor bolt assembly and construction method thereof
一种可更换的风电锚栓组合件及其施工方法
LI SHAOQING (author) / LI JIKUN (author) / LI XIANGQING (author) / LU YANCHAO (author) / WANG YANHUA (author) / LIU YAWEI (author)
2022-11-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Replaceable prestressed anchor bolt device and mounting and replacement construction method thereof
European Patent Office | 2015
|Replaceable prestress anchor bolt draught fan foundation
European Patent Office | 2016
|European Patent Office | 2022
|Replaceable anchor bolt assembly with adjustable anchoring length for concrete foundation
European Patent Office | 2021
|