Cast-in-place concrete cable well integral outer mold construction method
The invention provides a cast-in-place concrete cable well overall outer formwork construction method. The method comprises the steps that an outer formwork I is built outside a cable well; an outer formwork II is built outside the outer formwork I; and pouring construction is conducted, and mold plugging is conducted after construction is completed. According to the cast-in-place concrete cable well overall outer mold construction method, the problems that in the prior art, due to the non-standard construction, the water seepage or flooding phenomenon is caused, cables and a concrete bottom plate are corroded, short circuit or sinking is caused, and the construction quality and safety are affected are effectively solved, and the cast-in-place concrete cable well overall outer mold construction method is provided. By means of the method, accumulated water outside the cable well can be effectively prevented from permeating into the well, the well is kept in a dry state for a long time, underground water and rainwater are isolated from the well chamber, and therefore the situation that a large amount of water is stored in the well chamber to affect use of insulated cables and firmness of the concrete ground is avoided, and construction quality and safety are improved.
本发明提供一种现浇混凝土的电缆井整体外模施工方法,包括步骤:在电缆井外部砌筑外模板一;在所述外模板一外部砌筑外模板二;进行浇筑施工,施工完成后进行模具封堵。本发明有效解决目前现有技术中由于施工不规范导致渗水或漫水现象,腐蚀线缆和混凝土底板,导致短路或者下沉,影响施工质量和安全的问题,提供一种现浇混凝土的电缆井整体外模施工方法,该方法能够有效阻止电缆井外积水渗透进井内,使井内长期保持干燥状态,将地下水和雨水与井室隔离开,从而避免井室内储存大量水而影响绝缘线缆的使用和混凝土地面的坚固性,提高施工质量和安全性。
Cast-in-place concrete cable well integral outer mold construction method
The invention provides a cast-in-place concrete cable well overall outer formwork construction method. The method comprises the steps that an outer formwork I is built outside a cable well; an outer formwork II is built outside the outer formwork I; and pouring construction is conducted, and mold plugging is conducted after construction is completed. According to the cast-in-place concrete cable well overall outer mold construction method, the problems that in the prior art, due to the non-standard construction, the water seepage or flooding phenomenon is caused, cables and a concrete bottom plate are corroded, short circuit or sinking is caused, and the construction quality and safety are affected are effectively solved, and the cast-in-place concrete cable well overall outer mold construction method is provided. By means of the method, accumulated water outside the cable well can be effectively prevented from permeating into the well, the well is kept in a dry state for a long time, underground water and rainwater are isolated from the well chamber, and therefore the situation that a large amount of water is stored in the well chamber to affect use of insulated cables and firmness of the concrete ground is avoided, and construction quality and safety are improved.
本发明提供一种现浇混凝土的电缆井整体外模施工方法,包括步骤:在电缆井外部砌筑外模板一;在所述外模板一外部砌筑外模板二;进行浇筑施工,施工完成后进行模具封堵。本发明有效解决目前现有技术中由于施工不规范导致渗水或漫水现象,腐蚀线缆和混凝土底板,导致短路或者下沉,影响施工质量和安全的问题,提供一种现浇混凝土的电缆井整体外模施工方法,该方法能够有效阻止电缆井外积水渗透进井内,使井内长期保持干燥状态,将地下水和雨水与井室隔离开,从而避免井室内储存大量水而影响绝缘线缆的使用和混凝土地面的坚固性,提高施工质量和安全性。
Cast-in-place concrete cable well integral outer mold construction method
一种现浇混凝土的电缆井整体外模施工方法
GAO LIANLI (author) / MA FU (author) / LI XIANGYANG (author)
2022-11-04
Patent
Electronic Resource
Chinese
Integral cast-in-place construction method for shaped steel mold of inspection well
European Patent Office | 2020
|European Patent Office | 2021
|Full cast-in-place concrete outer wall and construction method
European Patent Office | 2023
|Modularized cast-in-place concrete mold and construction method thereof
European Patent Office | 2023
|Integral cast-in-place concrete bracket support construction method
European Patent Office | 2023
|