Construction method of assembly type building concealed assembly distribution box auxiliary detachable support
The invention discloses a construction method of an auxiliary detachable bracket for a concealed assembly distribution box of an assembly type building. The construction method comprises a process principle, a construction process flow and operation key points. The adjustable foot cups are vertically and firmly fixed between the ground and the top plate through the detachable support, after main body pouring acceptance inspection is qualified, an operator determines the erecting height and position of the support according to the installation height and structural elevation (beams, the top plate and the like) of a drawing pipeline, a component and a box body, the folded supporting frame is horizontally unfolded, the length of the supporting frame is adjusted, and the supporting frame is erected. The installation method comprises the following steps of: installing a prefabricated high-precision slide rail on a support frame in a T-joint manner, determining the installation height according to the height of a box body to be installed, connecting the prefabricated high-precision slide rail with the support frame through an M14 * 100 bolt, fastening the prefabricated high-precision slide rail after the prefabricated high-precision slide rail is verified to be qualified, ensuring that the high-precision slide rail does not shake, and connecting and fixing the box body with the high-precision slide rail through a fixing screw after the support is verified to be qualified. The box body is accurately positioned by adjusting the high-precision sliding rail according to a design drawing, and the installation deviation meets the design requirement.
本发明公开了一种装配式建筑暗装配电箱辅助可拆卸支架施工方法,包括工艺原理、施工工艺流程及操作要点。本发明通过可拆卸支架采用可调节脚杯在地面和顶板间垂直固定牢固,待主体浇筑验收合格后,操作人员根据图纸管线、构件、箱体安装高度及结构标高(梁、顶板等)确定支架搭设高度和位置,将折叠的支撑架水平展开,调节支撑架长度,必须满足结构高度,紧固螺栓并固定牢固,将预制好的高精滑轨T接安装在支撑架上,安装高度按待安装的箱体高度确定,并用M14*100螺栓将其连接,校检合格后紧固,确保高精滑轨不晃动,待支架校检合格后,将箱体采用固定螺丝与高精滑轨连接固定,按照设计图纸通过调节高精滑轨对箱体精确定位,安装偏差符合设计要求。
Construction method of assembly type building concealed assembly distribution box auxiliary detachable support
The invention discloses a construction method of an auxiliary detachable bracket for a concealed assembly distribution box of an assembly type building. The construction method comprises a process principle, a construction process flow and operation key points. The adjustable foot cups are vertically and firmly fixed between the ground and the top plate through the detachable support, after main body pouring acceptance inspection is qualified, an operator determines the erecting height and position of the support according to the installation height and structural elevation (beams, the top plate and the like) of a drawing pipeline, a component and a box body, the folded supporting frame is horizontally unfolded, the length of the supporting frame is adjusted, and the supporting frame is erected. The installation method comprises the following steps of: installing a prefabricated high-precision slide rail on a support frame in a T-joint manner, determining the installation height according to the height of a box body to be installed, connecting the prefabricated high-precision slide rail with the support frame through an M14 * 100 bolt, fastening the prefabricated high-precision slide rail after the prefabricated high-precision slide rail is verified to be qualified, ensuring that the high-precision slide rail does not shake, and connecting and fixing the box body with the high-precision slide rail through a fixing screw after the support is verified to be qualified. The box body is accurately positioned by adjusting the high-precision sliding rail according to a design drawing, and the installation deviation meets the design requirement.
本发明公开了一种装配式建筑暗装配电箱辅助可拆卸支架施工方法,包括工艺原理、施工工艺流程及操作要点。本发明通过可拆卸支架采用可调节脚杯在地面和顶板间垂直固定牢固,待主体浇筑验收合格后,操作人员根据图纸管线、构件、箱体安装高度及结构标高(梁、顶板等)确定支架搭设高度和位置,将折叠的支撑架水平展开,调节支撑架长度,必须满足结构高度,紧固螺栓并固定牢固,将预制好的高精滑轨T接安装在支撑架上,安装高度按待安装的箱体高度确定,并用M14*100螺栓将其连接,校检合格后紧固,确保高精滑轨不晃动,待支架校检合格后,将箱体采用固定螺丝与高精滑轨连接固定,按照设计图纸通过调节高精滑轨对箱体精确定位,安装偏差符合设计要求。
Construction method of assembly type building concealed assembly distribution box auxiliary detachable support
一种装配式建筑暗装配电箱辅助可拆卸支架施工方法