A platform for research: civil engineering, architecture and urbanism
Isolation curtain wall for building installation engineering and working method
The invention provides an isolation curtain wall for building installation engineering and a working method, and relates to the technical field of building engineering.The isolation curtain wall for building installation engineering comprises a building outer wall body, an outer sealing frame is fixedly installed at the edge of the outer surface of the building outer wall body, and a plurality of isolation curtain wall plate body units are arranged in the outer sealing frame; the multiple isolation curtain wall plate body units are arranged in a rectangular array, the back faces of the isolation curtain wall plate body units are fixedly connected with unit body rear side plates, and the side walls of the multiple unit body rear side plates located on the same horizontal line are jointly connected with a rotating long shaft rod. And a U-shaped mounting frame is rotationally connected to the outer surface of the rotating long shaft rod and located on the outer side of the rear side plate of the unit body. All the isolation curtain wall plate body units can be opened, and dry air enters the outer sealing frame, so that humid air in the outer sealing frame is removed, the building outer wall body can be quickly dried, and the cracking and water seepage conditions of the building outer wall body are avoided.
本发明提供一种建筑安装工程用隔离幕墙及工作方法,涉及建筑工程技术领域,该建筑安装工程用隔离幕墙,包括建筑外墙体,所述建筑外墙体的外表面边缘处固定安装有外密封框架,所述外密封框架的内部设置有多个隔离幕墙板体单元,多个所述隔离幕墙板体单元呈矩形阵列排布,所述隔离幕墙板体单元的背面固定连接有单元体后侧板,位于同一水平线上的多个所述单元体后侧板侧壁共同连接有旋转长轴杆,所述旋转长轴杆的外表面且位于单元体后侧板的外侧转动连接有U形安装框架。本发明可以打开所有的隔离幕墙板体单元,干燥的空气进入外密封框架内,从而去除外密封框架内潮湿的空气,让建筑外墙体可以快速干燥,避免建筑外墙体出现开裂渗水情况。
Isolation curtain wall for building installation engineering and working method
The invention provides an isolation curtain wall for building installation engineering and a working method, and relates to the technical field of building engineering.The isolation curtain wall for building installation engineering comprises a building outer wall body, an outer sealing frame is fixedly installed at the edge of the outer surface of the building outer wall body, and a plurality of isolation curtain wall plate body units are arranged in the outer sealing frame; the multiple isolation curtain wall plate body units are arranged in a rectangular array, the back faces of the isolation curtain wall plate body units are fixedly connected with unit body rear side plates, and the side walls of the multiple unit body rear side plates located on the same horizontal line are jointly connected with a rotating long shaft rod. And a U-shaped mounting frame is rotationally connected to the outer surface of the rotating long shaft rod and located on the outer side of the rear side plate of the unit body. All the isolation curtain wall plate body units can be opened, and dry air enters the outer sealing frame, so that humid air in the outer sealing frame is removed, the building outer wall body can be quickly dried, and the cracking and water seepage conditions of the building outer wall body are avoided.
本发明提供一种建筑安装工程用隔离幕墙及工作方法,涉及建筑工程技术领域,该建筑安装工程用隔离幕墙,包括建筑外墙体,所述建筑外墙体的外表面边缘处固定安装有外密封框架,所述外密封框架的内部设置有多个隔离幕墙板体单元,多个所述隔离幕墙板体单元呈矩形阵列排布,所述隔离幕墙板体单元的背面固定连接有单元体后侧板,位于同一水平线上的多个所述单元体后侧板侧壁共同连接有旋转长轴杆,所述旋转长轴杆的外表面且位于单元体后侧板的外侧转动连接有U形安装框架。本发明可以打开所有的隔离幕墙板体单元,干燥的空气进入外密封框架内,从而去除外密封框架内潮湿的空气,让建筑外墙体可以快速干燥,避免建筑外墙体出现开裂渗水情况。
Isolation curtain wall for building installation engineering and working method
一种建筑安装工程用隔离幕墙及工作方法
CHANG HAIXU (author) / XUN ZHIYUAN (author) / QIU XIANLE (author) / MA LING (author) / LIU QINGLIAN (author) / MU ZUOPENG (author)
2022-11-08
Patent
Electronic Resource
Chinese
Isolation curtain wall for building intelligent installation engineering
European Patent Office | 2020
|CURTAIN WALL UNIT, CURTAIN WALL INSTALLATION STRUCTURE, AND INSTALLATION METHOD OF CURTAIN WALL
European Patent Office | 2017
|Safety protection device for building curtain wall engineering installation
European Patent Office | 2025
|