A platform for research: civil engineering, architecture and urbanism
The invention relates to a water and electricity pipeline reserved hole formwork supporting device which comprises a pipeline and two bases, lifting mechanisms, supporting steel pipes, first hollow pipes and a left formwork are sequentially installed on the bases, the first hollow pipes are slidably connected with second hollow pipes, a right formwork is installed at the tops of the two second hollow pipes, and a first semicircular groove is formed in the right side of the left formwork. A second semicircular groove is formed in the left side of the right template, the first semicircular groove and the second semicircular groove are matched with the pipeline, a fixing piece is installed at one end of the second hollow pipe, one end of the rope is connected with the fixing piece, and the other end of the rope penetrates through the second hollow pipe and the first hollow pipe to be connected with the contraction mechanism. The rope is pulled through the contraction mechanism to splice the left formwork and the right formwork, the left formwork and the right formwork are lifted through the lifting mechanism, the concrete pouring process can be completed by one person, the labor cost is saved, an operator does not need to climb to work in the face of high building formwork hoisting construction, and the danger of the operator in the construction process is reduced.
本发明涉及一种水电管道预留孔洞模板支撑装置,包括管道和两个底座,底座上依次安装有升降机构、支撑钢管、第一空心管、左模板,第一空心管滑动连接有第二空心管,两个第二空心管的顶部安装右模板,左模板的右侧开设第一半圆凹槽,右模板的左侧开设第二半圆凹槽,第一半圆凹槽与第二半圆凹槽与管道适配,第二空心管的一端安装有固定件,绳索的一端与固定件连接,另一端穿过第二空心管和第一空心管与收缩机构连接。本发明通过收缩机构拉动绳索使左模板和右模板拼接,通过升降机构使左模板和右模板升降,混凝土浇筑过程一个人就能完成,节约人工成本,在面对较高的建筑吊模施工时,操作人员不用登高作业,降低操作人员施工过程的危险性。
The invention relates to a water and electricity pipeline reserved hole formwork supporting device which comprises a pipeline and two bases, lifting mechanisms, supporting steel pipes, first hollow pipes and a left formwork are sequentially installed on the bases, the first hollow pipes are slidably connected with second hollow pipes, a right formwork is installed at the tops of the two second hollow pipes, and a first semicircular groove is formed in the right side of the left formwork. A second semicircular groove is formed in the left side of the right template, the first semicircular groove and the second semicircular groove are matched with the pipeline, a fixing piece is installed at one end of the second hollow pipe, one end of the rope is connected with the fixing piece, and the other end of the rope penetrates through the second hollow pipe and the first hollow pipe to be connected with the contraction mechanism. The rope is pulled through the contraction mechanism to splice the left formwork and the right formwork, the left formwork and the right formwork are lifted through the lifting mechanism, the concrete pouring process can be completed by one person, the labor cost is saved, an operator does not need to climb to work in the face of high building formwork hoisting construction, and the danger of the operator in the construction process is reduced.
本发明涉及一种水电管道预留孔洞模板支撑装置,包括管道和两个底座,底座上依次安装有升降机构、支撑钢管、第一空心管、左模板,第一空心管滑动连接有第二空心管,两个第二空心管的顶部安装右模板,左模板的右侧开设第一半圆凹槽,右模板的左侧开设第二半圆凹槽,第一半圆凹槽与第二半圆凹槽与管道适配,第二空心管的一端安装有固定件,绳索的一端与固定件连接,另一端穿过第二空心管和第一空心管与收缩机构连接。本发明通过收缩机构拉动绳索使左模板和右模板拼接,通过升降机构使左模板和右模板升降,混凝土浇筑过程一个人就能完成,节约人工成本,在面对较高的建筑吊模施工时,操作人员不用登高作业,降低操作人员施工过程的危险性。
Water and electricity pipeline reserved hole formwork supporting device and construction method thereof
一种水电管道预留孔洞模板支撑装置及其施工方法
2022-11-08
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Floor pipeline reserved hole plugging formwork and construction method
European Patent Office | 2021
|Reserved hole modular combination adjustable formwork structure and construction method
European Patent Office | 2024
|Reserved hole formwork reinforcing device convenient to disassemble
European Patent Office | 2023
|Pipeline reserved hole plugging mold and construction method
European Patent Office | 2021
|