A platform for research: civil engineering, architecture and urbanism
Split-level suspended ceiling structure and mounting method
The split-level suspended ceiling structure comprises a suspended ceiling plate, an n-shaped keel is installed on the upper end face of the suspended ceiling plate, and the top of the n-shaped keel is fixedly connected with a floor; first clamping parts are formed at the two ends of the suspended ceiling plate, one end of the suspended ceiling plate is in clamping fit with a second clamping part formed at the upper end of the split-level plate through the first clamping parts, and the lower end of the split-level plate is fixedly connected with the side plate through a caulking strip. The lower end of the split-level plate is matched with the caulking in an inserted mode, connection between the split-level plate and the ceiling plate and connection between the split-level plate and the side plate are achieved, a split-level ceiling structure is formed, the whole split-level ceiling component is simple, and quick installation of a split-level ceiling is facilitated.
一种错层式吊顶结构与安装方法,包括吊顶板,所述吊顶板的上端面安装几字龙骨,所述几字龙骨顶部与楼板固定连接;所述吊顶板的两端形成第一卡接件,所述吊顶板的一端通过第一卡接件与错层板上端形成的第二卡接件卡接配合,所述错层板下端通过嵌缝条与边板固定连接,本发明的错层板上端通过第一卡接件、第二卡接件卡接配合,错层板下端通过与嵌缝的插接配合,即实现了错层板与吊顶板、边板之间的连接,形成了错层式吊顶结构,整个错层式吊顶构件简单有利于错层吊顶的快速安装。
Split-level suspended ceiling structure and mounting method
The split-level suspended ceiling structure comprises a suspended ceiling plate, an n-shaped keel is installed on the upper end face of the suspended ceiling plate, and the top of the n-shaped keel is fixedly connected with a floor; first clamping parts are formed at the two ends of the suspended ceiling plate, one end of the suspended ceiling plate is in clamping fit with a second clamping part formed at the upper end of the split-level plate through the first clamping parts, and the lower end of the split-level plate is fixedly connected with the side plate through a caulking strip. The lower end of the split-level plate is matched with the caulking in an inserted mode, connection between the split-level plate and the ceiling plate and connection between the split-level plate and the side plate are achieved, a split-level ceiling structure is formed, the whole split-level ceiling component is simple, and quick installation of a split-level ceiling is facilitated.
一种错层式吊顶结构与安装方法,包括吊顶板,所述吊顶板的上端面安装几字龙骨,所述几字龙骨顶部与楼板固定连接;所述吊顶板的两端形成第一卡接件,所述吊顶板的一端通过第一卡接件与错层板上端形成的第二卡接件卡接配合,所述错层板下端通过嵌缝条与边板固定连接,本发明的错层板上端通过第一卡接件、第二卡接件卡接配合,错层板下端通过与嵌缝的插接配合,即实现了错层板与吊顶板、边板之间的连接,形成了错层式吊顶结构,整个错层式吊顶构件简单有利于错层吊顶的快速安装。
Split-level suspended ceiling structure and mounting method
一种错层式吊顶结构与安装方法
DING XINXIN (author) / ZHOU DONGSHAN (author) / WANG WENGUANG (author) / JIANG KAITING (author) / FANG MOUYONG (author)
2022-11-11
Patent
Electronic Resource
Chinese
Split-level assembled suspended ceiling mounting structure
European Patent Office | 2020
|European Patent Office | 2021
|Ceiling type suspended ceiling mounting structure and suspended ceiling mounting method thereof
European Patent Office | 2021
|European Patent Office | 2021
|European Patent Office | 2021
|