A platform for research: civil engineering, architecture and urbanism
Supporting device for integral construction of pipe truss
The invention relates to the technical field of pipe truss construction, in particular to a supporting device for pipe truss integral construction, which is characterized in that a middle supporting plate is arranged in the middle of a supporting pipe, a middle supporting hinge frame is arranged at the bottom of the middle supporting plate, and a first supporting rod is rotatably connected to one end, away from the middle supporting plate, of the middle supporting hinge frame; the second supporting rod is inserted into the telescopic hole, a limiting block is arranged on the surface of the second supporting rod, and a telescopic groove is formed in the surface of the limiting block; the clamping block is arranged in the telescopic groove; the device has the beneficial effects that after a supporting pipe is connected with a fixing bolt embedded in the bottom face through a bottom connecting flange, the distance between a first supporting rod and a second supporting rod is adjusted according to the size of a site, the first supporting rod is rotated to adjust the angle between the first supporting rod and the second supporting rod, and then the second supporting rod is fixed to the ground through an expansion bolt; at the moment, the periphery of the supporting pipe is laterally supported by the first supporting rod and the second supporting rod, and the oblique stress strength of the supporting pipe is improved.
本发明涉及管桁架施工技术领域,具体为一种管桁架整体施工用支撑装置,包括:支撑管的中部设置有中部支撑板,中部支撑板的底部设置有中部支撑铰接架,中部支撑铰接架远离中部支撑板的一端转动连接有第一支撑杆;第二支撑杆插接于伸缩孔的内部,第二支撑杆的表面设置有限位块,限位块的表面开设有伸缩槽;卡块设置于伸缩槽的内部;有益效果为:将支撑管通过底部连接法兰与底面预埋的固定螺栓连接后,根据场地的大小调节第一支撑杆与第二支撑杆之间的距离,转动第一支撑杆调节第一支撑杆和第二支撑杆的角度,然后通过膨胀螺栓将第二支撑杆固定于地面,此时通过第一支撑杆和第二支撑杆从侧向支撑支撑管的一周,增大了支撑管的斜向受力强度。
Supporting device for integral construction of pipe truss
The invention relates to the technical field of pipe truss construction, in particular to a supporting device for pipe truss integral construction, which is characterized in that a middle supporting plate is arranged in the middle of a supporting pipe, a middle supporting hinge frame is arranged at the bottom of the middle supporting plate, and a first supporting rod is rotatably connected to one end, away from the middle supporting plate, of the middle supporting hinge frame; the second supporting rod is inserted into the telescopic hole, a limiting block is arranged on the surface of the second supporting rod, and a telescopic groove is formed in the surface of the limiting block; the clamping block is arranged in the telescopic groove; the device has the beneficial effects that after a supporting pipe is connected with a fixing bolt embedded in the bottom face through a bottom connecting flange, the distance between a first supporting rod and a second supporting rod is adjusted according to the size of a site, the first supporting rod is rotated to adjust the angle between the first supporting rod and the second supporting rod, and then the second supporting rod is fixed to the ground through an expansion bolt; at the moment, the periphery of the supporting pipe is laterally supported by the first supporting rod and the second supporting rod, and the oblique stress strength of the supporting pipe is improved.
本发明涉及管桁架施工技术领域,具体为一种管桁架整体施工用支撑装置,包括:支撑管的中部设置有中部支撑板,中部支撑板的底部设置有中部支撑铰接架,中部支撑铰接架远离中部支撑板的一端转动连接有第一支撑杆;第二支撑杆插接于伸缩孔的内部,第二支撑杆的表面设置有限位块,限位块的表面开设有伸缩槽;卡块设置于伸缩槽的内部;有益效果为:将支撑管通过底部连接法兰与底面预埋的固定螺栓连接后,根据场地的大小调节第一支撑杆与第二支撑杆之间的距离,转动第一支撑杆调节第一支撑杆和第二支撑杆的角度,然后通过膨胀螺栓将第二支撑杆固定于地面,此时通过第一支撑杆和第二支撑杆从侧向支撑支撑管的一周,增大了支撑管的斜向受力强度。
Supporting device for integral construction of pipe truss
一种管桁架整体施工用支撑装置
MA HAILONG (author) / LI GUOLIANG (author) / PANG CHAO (author)
2022-11-11
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Large-span truss building structure construction method and truss supporting device
European Patent Office | 2024
|