A platform for research: civil engineering, architecture and urbanism
High-efficiency dredging equipment for hydraulic engineering construction
The invention discloses high-efficiency desilting equipment for hydraulic engineering construction, which comprises a collecting unit, a desilting unit, a desilting unit, a desilting unit, a desilting unit and a desilting unit, the main body connecting unit comprises a front side fixing plate fixedly arranged on the front side of the ship body, fixing rods symmetrically and fixedly connected to the front side fixing plate, a connecting shaft connected to the fixing rods in a matched mode and main body fixing supports installed at the two ends of the connecting shaft. The sludge suction unit comprises a sludge suction pipe, a sludge suction cover connected to the sludge suction pipe and a rotating roller assembly arranged on the inner side of the sludge suction cover, and walking wheels are symmetrically arranged on the two sides of the rotating roller assembly. The sludge suction unit and the flushing unit are matched with the ship body to conduct dredging work, before sludge is pumped out, the walking wheels roll at the bottom of a riverbed to drive the rotating roller assembly to rotate, so that the sludge at the bottom is stirred and scattered, sludge suction is facilitated, and the workload of suction equipment is relieved.
本发明公开了一种水利工程施工用高效率清淤设备,包括:收集单元,其包括设置在船体上的收集箱以及泵房机组;主体连接单元,其包括固定设置在船体前侧的前侧固定板、对称固定连接在前侧固定板上的固定杆、配合连接在固定杆上的连接轴、以及安装设置在所述连接轴两端的主体固定支架;吸泥单元,其包括吸泥管、连接设置于所述吸泥管上的吸泥罩、设置于所述吸泥罩内侧的转辊组件,所述转辊组件的两侧对称设置有行走轮。本发明通过吸泥单元、冲洗单元配合船体进行清淤工作,在进行淤泥抽出前,行走轮在河床底部的滚动带动转辊组件转动,从而对底部的淤泥进行搅散,便于淤泥抽吸,减轻抽吸设备的工作负担。
High-efficiency dredging equipment for hydraulic engineering construction
The invention discloses high-efficiency desilting equipment for hydraulic engineering construction, which comprises a collecting unit, a desilting unit, a desilting unit, a desilting unit, a desilting unit and a desilting unit, the main body connecting unit comprises a front side fixing plate fixedly arranged on the front side of the ship body, fixing rods symmetrically and fixedly connected to the front side fixing plate, a connecting shaft connected to the fixing rods in a matched mode and main body fixing supports installed at the two ends of the connecting shaft. The sludge suction unit comprises a sludge suction pipe, a sludge suction cover connected to the sludge suction pipe and a rotating roller assembly arranged on the inner side of the sludge suction cover, and walking wheels are symmetrically arranged on the two sides of the rotating roller assembly. The sludge suction unit and the flushing unit are matched with the ship body to conduct dredging work, before sludge is pumped out, the walking wheels roll at the bottom of a riverbed to drive the rotating roller assembly to rotate, so that the sludge at the bottom is stirred and scattered, sludge suction is facilitated, and the workload of suction equipment is relieved.
本发明公开了一种水利工程施工用高效率清淤设备,包括:收集单元,其包括设置在船体上的收集箱以及泵房机组;主体连接单元,其包括固定设置在船体前侧的前侧固定板、对称固定连接在前侧固定板上的固定杆、配合连接在固定杆上的连接轴、以及安装设置在所述连接轴两端的主体固定支架;吸泥单元,其包括吸泥管、连接设置于所述吸泥管上的吸泥罩、设置于所述吸泥罩内侧的转辊组件,所述转辊组件的两侧对称设置有行走轮。本发明通过吸泥单元、冲洗单元配合船体进行清淤工作,在进行淤泥抽出前,行走轮在河床底部的滚动带动转辊组件转动,从而对底部的淤泥进行搅散,便于淤泥抽吸,减轻抽吸设备的工作负担。
High-efficiency dredging equipment for hydraulic engineering construction
一种水利工程施工用高效率清淤设备
ZHOU JINGHAO (author) / YI CHUANHUA (author) / KOU LINBING (author) / ZHANG DONGLIN (author) / WANG HAIQUAN (author)
2022-11-15
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
High-efficiency dredging equipment for hydraulic engineering construction
European Patent Office | 2024
|Dredging equipment for hydraulic engineering construction
European Patent Office | 2023
|Multifunctional dredging equipment for hydraulic engineering construction
European Patent Office | 2024
|River channel dredging equipment for hydraulic engineering construction
European Patent Office | 2024
|High-efficiency hydraulic engineering channel dredging device
European Patent Office | 2022
|