Mirror surface concrete and pier body construction method
The invention relates to the technical field of concrete and pier body construction, in particular to mirror concrete and a pier body construction method, and the mirror concrete is prepared from cement, sand, fly ash, stone, water and a water reducing agent according to a weight part ratio of 450: 600: 350: 950: 150: 4.5. The pier body construction method comprises the steps of binding and hoisting of a pier body steel reinforcement framework, formwork installation, concrete proportioning, concrete pouring, formwork removal and concrete curing. By controlling a series of processes and parameters such as concrete raw material control, template treatment, template paint brushing control, reinforcing steel bar hoisting control, concrete pouring control, vibration control and maintenance control, a concrete structure finally obtains a mirror-like appearance effect, the target requirement is met, meanwhile, due to the fact that the procedures such as plastering are omitted, the construction cost is reduced, and the construction efficiency is improved. And extra social and economic benefits are created.
本发明涉及混凝土及墩身施工技术领域,具体的说是一种镜面混凝土及墩身施工方法,其中镜面混凝土,按重量份配合比为水泥:砂:粉煤灰:石子:水:减水剂=450:600:350:950:150:4.5。本发明墩身施工方法包括墩身钢筋骨架的绑扎与吊装、模板安装、混凝土配比、混凝土浇筑、拆模以及混凝土养护。本发明通过对混凝土原材料控制、模板处理、模板漆涂刷控制、钢筋吊装控制、混凝土浇筑控制、振捣控制、养护控制等一系列过程及参数的控制,最终使混凝土结构物获得了镜面般的外观效果,达到了目标要求,同时由于取消抹灰等工序,创造出额外的社会及经济效益。
Mirror surface concrete and pier body construction method
The invention relates to the technical field of concrete and pier body construction, in particular to mirror concrete and a pier body construction method, and the mirror concrete is prepared from cement, sand, fly ash, stone, water and a water reducing agent according to a weight part ratio of 450: 600: 350: 950: 150: 4.5. The pier body construction method comprises the steps of binding and hoisting of a pier body steel reinforcement framework, formwork installation, concrete proportioning, concrete pouring, formwork removal and concrete curing. By controlling a series of processes and parameters such as concrete raw material control, template treatment, template paint brushing control, reinforcing steel bar hoisting control, concrete pouring control, vibration control and maintenance control, a concrete structure finally obtains a mirror-like appearance effect, the target requirement is met, meanwhile, due to the fact that the procedures such as plastering are omitted, the construction cost is reduced, and the construction efficiency is improved. And extra social and economic benefits are created.
本发明涉及混凝土及墩身施工技术领域,具体的说是一种镜面混凝土及墩身施工方法,其中镜面混凝土,按重量份配合比为水泥:砂:粉煤灰:石子:水:减水剂=450:600:350:950:150:4.5。本发明墩身施工方法包括墩身钢筋骨架的绑扎与吊装、模板安装、混凝土配比、混凝土浇筑、拆模以及混凝土养护。本发明通过对混凝土原材料控制、模板处理、模板漆涂刷控制、钢筋吊装控制、混凝土浇筑控制、振捣控制、养护控制等一系列过程及参数的控制,最终使混凝土结构物获得了镜面般的外观效果,达到了目标要求,同时由于取消抹灰等工序,创造出额外的社会及经济效益。
Mirror surface concrete and pier body construction method
一种镜面混凝土及墩身施工方法
2022-11-22
Patent
Electronic Resource
Chinese
Pier body mass concrete temperature control construction device
European Patent Office | 2020
|Ferro-concrete pier construction
Engineering Index Backfile | 1911
|Reinforced concrete pier construction
Engineering Index Backfile | 1910
|Reinforced Concrete Pier Construction
ASCE | 2021
|