A platform for research: civil engineering, architecture and urbanism
High-stability road subgrade construction device and construction method
The invention discloses a high-stability road subgrade construction device and method. The high-stability road subgrade construction device comprises a broken stone distribution chamber, a plurality of advancing wheels are installed on the broken stone distribution chamber, a stone inlet is formed in the broken stone distribution chamber, a broken stone construction opening is formed in the broken stone distribution chamber, and a compaction bin is fixedly connected to one side of the broken stone distribution chamber; a vertical groove is formed in the bottom of the compaction bin, the vertical groove is communicated with the gravel construction opening, a compaction block is arranged in the vertical groove in a sliding mode, a driving mechanism used for driving the compaction block to move is arranged on the compaction bin, and a compression roller is installed on the side, away from the gravel distribution chamber, of the compaction bin. According to the invention, the flatness of gravel laying can be conveniently improved.
本发明公开了一种高稳定性道路路基施工装置及施工方法,其包括碎石布料室,所述碎石布料室上安装有多个行进轮,所述碎石布料室上设置有石块入口,所述碎石布料室上开设有碎石施工口,所述碎石布料室的一侧固定连接有压实仓,所述压实仓的底部开设有竖直槽,所述竖直槽与所述碎石施工口相连通,所述竖直槽内滑动设置有压实块,所述压实仓上设置有用于驱动所述压实块移动的驱动机构,所述压实仓远离所述碎石布料室的一侧安装有压辊。本发明能够便于提高碎石铺设的平整度。
High-stability road subgrade construction device and construction method
The invention discloses a high-stability road subgrade construction device and method. The high-stability road subgrade construction device comprises a broken stone distribution chamber, a plurality of advancing wheels are installed on the broken stone distribution chamber, a stone inlet is formed in the broken stone distribution chamber, a broken stone construction opening is formed in the broken stone distribution chamber, and a compaction bin is fixedly connected to one side of the broken stone distribution chamber; a vertical groove is formed in the bottom of the compaction bin, the vertical groove is communicated with the gravel construction opening, a compaction block is arranged in the vertical groove in a sliding mode, a driving mechanism used for driving the compaction block to move is arranged on the compaction bin, and a compression roller is installed on the side, away from the gravel distribution chamber, of the compaction bin. According to the invention, the flatness of gravel laying can be conveniently improved.
本发明公开了一种高稳定性道路路基施工装置及施工方法,其包括碎石布料室,所述碎石布料室上安装有多个行进轮,所述碎石布料室上设置有石块入口,所述碎石布料室上开设有碎石施工口,所述碎石布料室的一侧固定连接有压实仓,所述压实仓的底部开设有竖直槽,所述竖直槽与所述碎石施工口相连通,所述竖直槽内滑动设置有压实块,所述压实仓上设置有用于驱动所述压实块移动的驱动机构,所述压实仓远离所述碎石布料室的一侧安装有压辊。本发明能够便于提高碎石铺设的平整度。
High-stability road subgrade construction device and construction method
一种高稳定性道路路基施工装置及施工方法
ZHAO DINGPIN (author) / NI RONGWEI (author) / CHEN HAO (author) / ZHU MENGJIAO (author) / XIA SHENGTONG (author)
2022-11-22
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Drainage structure for road subgrade construction and construction method
European Patent Office | 2024
|Road Construction over Expansive Soil-Subgrade
British Library Conference Proceedings | 2001
|