A platform for research: civil engineering, architecture and urbanism
Maintenance method of ultrathin overlay for white-to-black pavement
The invention relates to the technical field of white-to-black road treatment, in particular to an ultrathin overlay maintenance method for a white-to-black road surface. The method comprises the following steps: 1) treating an original cement concrete pavement so that the pavement structure is complete, clean and smooth; (2) uniformly stirring and mixing the asphalt mixture, and trowelling by using a flat plate type vibration rammer compactor after paving; the asphalt mixture comprises the following components in parts by weight: 20-30 parts of modified emulsified asphalt, 3-5 parts of basalt fibers, 25-40 parts of limestone particles, 1-5 parts of cement, 1-5 parts of a silane coupling agent and 20-50 parts of water, and (3) after the water in the asphalt mixture is completely evaporated, rolling to obtain the ultrathin asphalt overlay of 1-2cm.
本发明涉及白改黑路处理技术领域,具体而言,涉及一种用于白改黑路面的超薄罩面层养护方法。该方法包括:1)对原水泥混凝土路面进行处理以使得路面结构完整、清洁、平顺;2)将沥青混合料搅拌混匀,铺摊后使用平板型震动夯实机抹平;所述沥青混合料重量份计,包括改性乳化沥青20~30份、玄武岩纤维3~5份、石灰岩颗粒25~40份、水泥1~5份、硅烷偶联剂1~5份以及水20~50份;3)待沥青混合料中的水分蒸发完毕后,碾压得到1cm~2cm的超薄沥青罩面。
Maintenance method of ultrathin overlay for white-to-black pavement
The invention relates to the technical field of white-to-black road treatment, in particular to an ultrathin overlay maintenance method for a white-to-black road surface. The method comprises the following steps: 1) treating an original cement concrete pavement so that the pavement structure is complete, clean and smooth; (2) uniformly stirring and mixing the asphalt mixture, and trowelling by using a flat plate type vibration rammer compactor after paving; the asphalt mixture comprises the following components in parts by weight: 20-30 parts of modified emulsified asphalt, 3-5 parts of basalt fibers, 25-40 parts of limestone particles, 1-5 parts of cement, 1-5 parts of a silane coupling agent and 20-50 parts of water, and (3) after the water in the asphalt mixture is completely evaporated, rolling to obtain the ultrathin asphalt overlay of 1-2cm.
本发明涉及白改黑路处理技术领域,具体而言,涉及一种用于白改黑路面的超薄罩面层养护方法。该方法包括:1)对原水泥混凝土路面进行处理以使得路面结构完整、清洁、平顺;2)将沥青混合料搅拌混匀,铺摊后使用平板型震动夯实机抹平;所述沥青混合料重量份计,包括改性乳化沥青20~30份、玄武岩纤维3~5份、石灰岩颗粒25~40份、水泥1~5份、硅烷偶联剂1~5份以及水20~50份;3)待沥青混合料中的水分蒸发完毕后,碾压得到1cm~2cm的超薄沥青罩面。
Maintenance method of ultrathin overlay for white-to-black pavement
一种用于白改黑路面的超薄罩面层养护方法
HE BAIQING (author) / YAO YUEKAI (author) / YE MING (author) / HE MU (author) / WANG YAN (author) / CHEN YUANYUAN (author) / XU ZHIDONG (author) / TAN LIN (author) / SUN JIAXUN (author)
2022-11-25
Patent
Electronic Resource
Chinese
Ultrathin overlay pavement structure for preventive maintenance
European Patent Office | 2023
|European Patent Office | 2021
|European Patent Office | 2022
|European Patent Office | 2022
|Overlay Design Procedure for Pavement Maintenance Management Systems
British Library Online Contents | 1992
|