A platform for research: civil engineering, architecture and urbanism
Planning method for double-layer frame pier of oblique crossing line of railway
The invention discloses a planning method for a double-layer frame pier of a railway skew line. The planning method comprises the following steps that loads of an upper-layer box girder and a lower-layer box girder are determined; determining load action positions of the upper-layer box girder and the lower-layer box girder; determining the resultant action point of the upper and lower railway box girders; determining the center line position of a double-layer frame pier beam; determining the minimum width of a frame pier cross beam; and completing the design of the skew line. According to the planning method for the double-layer frame pier of the oblique crossing railway, the out-of-plane effects of the upper-layer oblique crossing railway and the lower-layer oblique crossing railway on the double-layer frame pier can be basically symmetrical, and the torsion stress of the structure is reduced. According to the planning method for the double-layer frame pier of the oblique crossing railway, the width of the cross beam of the double-layer frame pier of the oblique crossing railway can be reduced, or arrangement of tooth blocks is avoided, construction is facilitated, and investment is saved.
本发明公开了一种铁路斜交线路双层框架墩的规划方法,包括以下步骤:确定上层箱梁和下层箱梁的荷载;确定上层箱梁和下层箱梁的荷载作用位置;确定上、下层铁路箱梁合力作用点;确定双层框架墩横梁中心线位置;确定框架墩横梁最小宽度;完成斜交线路的设计。本发明提出铁路斜交线路双层框架墩的规划方法,能够使上下层斜交铁路对双层框架墩平面外作用基本对称,减小了结构的扭转受力。本发明提出的铁路斜交线路双层框架墩的规划方法,能够减少斜交铁路双层框架墩的横梁宽度,或避免设置齿块,方便了施工,节省了投资。
Planning method for double-layer frame pier of oblique crossing line of railway
The invention discloses a planning method for a double-layer frame pier of a railway skew line. The planning method comprises the following steps that loads of an upper-layer box girder and a lower-layer box girder are determined; determining load action positions of the upper-layer box girder and the lower-layer box girder; determining the resultant action point of the upper and lower railway box girders; determining the center line position of a double-layer frame pier beam; determining the minimum width of a frame pier cross beam; and completing the design of the skew line. According to the planning method for the double-layer frame pier of the oblique crossing railway, the out-of-plane effects of the upper-layer oblique crossing railway and the lower-layer oblique crossing railway on the double-layer frame pier can be basically symmetrical, and the torsion stress of the structure is reduced. According to the planning method for the double-layer frame pier of the oblique crossing railway, the width of the cross beam of the double-layer frame pier of the oblique crossing railway can be reduced, or arrangement of tooth blocks is avoided, construction is facilitated, and investment is saved.
本发明公开了一种铁路斜交线路双层框架墩的规划方法,包括以下步骤:确定上层箱梁和下层箱梁的荷载;确定上层箱梁和下层箱梁的荷载作用位置;确定上、下层铁路箱梁合力作用点;确定双层框架墩横梁中心线位置;确定框架墩横梁最小宽度;完成斜交线路的设计。本发明提出铁路斜交线路双层框架墩的规划方法,能够使上下层斜交铁路对双层框架墩平面外作用基本对称,减小了结构的扭转受力。本发明提出的铁路斜交线路双层框架墩的规划方法,能够减少斜交铁路双层框架墩的横梁宽度,或避免设置齿块,方便了施工,节省了投资。
Planning method for double-layer frame pier of oblique crossing line of railway
一种铁路斜交线路双层框架墩的规划方法
SU WEI (author) / XING YU (author) / ZUO JIAQIANG (author) / WAN MING (author) / WANG XIA (author) / WU DAHONG (author) / ZHANG ZHEN (author) / ZHANG HAI (author) / XI JINGYU (author) / WU JI (author)
2022-11-25
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Swivel device for gate-type pier crossing existing railway
European Patent Office | 2024
|Construction method of prestressed concrete gate-type pier crossing existing railway bridge
European Patent Office | 2023
|Construction method for door-shaped pier crossing existing line
European Patent Office | 2024
|European Patent Office | 2020
|