A platform for research: civil engineering, architecture and urbanism
Method for treating heavy metal contaminated soil through newly-built expressway
The invention discloses a method for treating heavy metal contaminated soil by utilizing a newly-built expressway, which comprises the following steps: casting a barrier landfill device on a roadbed of the newly-built expressway in situ or prefabricating the barrier landfill device on a prefabricating site, and filling the barrier landfill device with contaminated soil; according to the method for treating the heavy metal contaminated soil through the newly-built expressway, the structure is reasonable, the structure is arranged at the bottom of the newly-built expressway, the contaminated soil is placed in the prefabricated barrier landfill device, and pollutant permeation is effectively prevented through combination of geotechnical cloth and an HDPE membrane; meanwhile, the amount of backfill soil in the highway building process is reduced, and the construction cost can be controlled easily.
本发明公开了一种利用新建高速公路处置重金属污染土壤的方法,其包括:在新建高速公路的路基上现场浇筑阻隔填埋装置或在预制场地预制阻隔填埋装置,在上述阻隔填埋装置填入污染土壤;本发明提供的利用新建高速公路处置重金属污染土壤的方法,其结构合理,设置在新建高速公路的底部,将污染土壤放置于预制的阻隔填埋装置中,利用土工布与HDPE膜组合,有效防止污染物渗透;同时减少了新建公路过程中回填土的数量,有利于控制施工成本。
Method for treating heavy metal contaminated soil through newly-built expressway
The invention discloses a method for treating heavy metal contaminated soil by utilizing a newly-built expressway, which comprises the following steps: casting a barrier landfill device on a roadbed of the newly-built expressway in situ or prefabricating the barrier landfill device on a prefabricating site, and filling the barrier landfill device with contaminated soil; according to the method for treating the heavy metal contaminated soil through the newly-built expressway, the structure is reasonable, the structure is arranged at the bottom of the newly-built expressway, the contaminated soil is placed in the prefabricated barrier landfill device, and pollutant permeation is effectively prevented through combination of geotechnical cloth and an HDPE membrane; meanwhile, the amount of backfill soil in the highway building process is reduced, and the construction cost can be controlled easily.
本发明公开了一种利用新建高速公路处置重金属污染土壤的方法,其包括:在新建高速公路的路基上现场浇筑阻隔填埋装置或在预制场地预制阻隔填埋装置,在上述阻隔填埋装置填入污染土壤;本发明提供的利用新建高速公路处置重金属污染土壤的方法,其结构合理,设置在新建高速公路的底部,将污染土壤放置于预制的阻隔填埋装置中,利用土工布与HDPE膜组合,有效防止污染物渗透;同时减少了新建公路过程中回填土的数量,有利于控制施工成本。
Method for treating heavy metal contaminated soil through newly-built expressway
一种利用新建高速公路处置重金属污染土壤的方法
HU HONGXIA (author) / WANG GENG (author) / FU LEI (author) / HAO ZHANDONG (author) / DING ZHENYU (author) / LU WEI (author) / LIU FENGPING (author) / ZHANG YANKUN (author) / ZHONG WEIBO (author) / SUN NING (author)
2022-11-25
Patent
Electronic Resource
Chinese
Interchange structure for covering existing road on newly-built expressway
European Patent Office | 2022
|European Patent Office | 2024
|HEAVY METAL INSOLUBILIZED COMPOSITION AND METHOD FOR REPAIRING HEAVY METAL CONTAMINATED SOIL
European Patent Office | 2016
|Heating provides built-in safety for expressway ramps
Engineering Index Backfile | 1954
|