A platform for research: civil engineering, architecture and urbanism
Floor tile hollowing prevention construction method
The invention relates to the technical field of images, and discloses a floor tile hollowing prevention construction method. According to the scheme, the size of the floor is measured, and the ground is measured and paid off through the gradienter; after surveying and setting-out are completed, the ground is watered and brushed with plain cement paste, and dry and hard cement mortar is laid and leveled; the floor tiles are coated with preset plain cement ash, the evenly-coated floor tiles are placed on the dry and hard cement mortar according to a preset laying rule, a tool is used for knocking the floor tiles with proper force, and air between the floor tiles and the ground is squeezed out; after the floor tiles are laid, a thin film is laid on the laid floor tiles, and water in the floor tiles is prevented from losing; therefore, the technical problem that floor tiles in the prior art are prone to hollowing is solved.
本申请涉及图像技术领域,揭示了一种地砖防空鼓施工方法。本申请的方案中,测量地板的尺寸,通过水平仪对地面进行测量放线;测量放线完成之后,对地面进行浇水并涂刷素水泥浆,铺设干硬性水泥砂浆并找平;将地砖的涂抹上预调的素水泥灰,涂抹均匀的地砖按照预设的铺设规则放入干硬性水泥砂浆上,并使用工具对地砖进行适当力度敲击,使地砖与地面之间的空气挤出;地砖铺设完成之后,将铺设完成的地砖进行铺设薄膜,防止地砖内部的水分流失;从而以解决现有技术中的地砖容易出现空鼓的技术问题。
Floor tile hollowing prevention construction method
The invention relates to the technical field of images, and discloses a floor tile hollowing prevention construction method. According to the scheme, the size of the floor is measured, and the ground is measured and paid off through the gradienter; after surveying and setting-out are completed, the ground is watered and brushed with plain cement paste, and dry and hard cement mortar is laid and leveled; the floor tiles are coated with preset plain cement ash, the evenly-coated floor tiles are placed on the dry and hard cement mortar according to a preset laying rule, a tool is used for knocking the floor tiles with proper force, and air between the floor tiles and the ground is squeezed out; after the floor tiles are laid, a thin film is laid on the laid floor tiles, and water in the floor tiles is prevented from losing; therefore, the technical problem that floor tiles in the prior art are prone to hollowing is solved.
本申请涉及图像技术领域,揭示了一种地砖防空鼓施工方法。本申请的方案中,测量地板的尺寸,通过水平仪对地面进行测量放线;测量放线完成之后,对地面进行浇水并涂刷素水泥浆,铺设干硬性水泥砂浆并找平;将地砖的涂抹上预调的素水泥灰,涂抹均匀的地砖按照预设的铺设规则放入干硬性水泥砂浆上,并使用工具对地砖进行适当力度敲击,使地砖与地面之间的空气挤出;地砖铺设完成之后,将铺设完成的地砖进行铺设薄膜,防止地砖内部的水分流失;从而以解决现有技术中的地砖容易出现空鼓的技术问题。
Floor tile hollowing prevention construction method
地砖防空鼓施工方法
BAI KAIWEI (author) / HU XUEWU (author) / ZHANG JINGYI (author) / ZHOU JICHANG (author) / GUO HONGYUAN (author) / HUANG GANG (author)
2022-11-25
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Floor tile hollowing detection robot and detection method thereof
European Patent Office | 2023
|Floor tile paving device capable of reducing hollowing and for building construction
European Patent Office | 2020
|