A platform for research: civil engineering, architecture and urbanism
Bridge deck concrete curing device for highway engineering bridge construction
The invention relates to a highway engineering bridge construction bridge floor concrete curing device which comprises a covering piece and a watering cart, the covering piece comprises two water storage layers and a water-resisting layer, the water-resisting layer is arranged between the two water storage layers in a clamped mode, water permeable holes are formed in the water-resisting layer, the watering cart comprises a water tank, rollers are arranged at the lower end of the water tank, and the water tank is arranged on the water tank. Sprayers are arranged on the side face of the water tank. According to the highway engineering bridge construction bridge floor concrete curing device, the covering piece comprises the water storage layer and the water resisting layer, water is stored through the water storage layer, water slowly permeates into a concrete pavement, the water spraying frequency can be reduced, and the effects of heat preservation and moisture preservation are achieved.
本发明涉及一种公路工程桥梁施工桥面混凝土养护装置,包括覆盖片和洒水车,覆盖片包括蓄水层和隔水层,蓄水层为两层,两层蓄水层之间夹设隔水层,隔水层上设有透水孔,洒水车包括水箱,水箱下端设有滚轮,水箱上设有水箱,水箱上的侧面设有喷头。本发明提供的公路工程桥梁施工桥面混凝土养护装置,覆盖片包括蓄水层和隔水层,通过蓄水层储蓄水量,慢慢渗透到混凝土路面,不仅能减少洒水频次,而且具有保温保湿的功效。
Bridge deck concrete curing device for highway engineering bridge construction
The invention relates to a highway engineering bridge construction bridge floor concrete curing device which comprises a covering piece and a watering cart, the covering piece comprises two water storage layers and a water-resisting layer, the water-resisting layer is arranged between the two water storage layers in a clamped mode, water permeable holes are formed in the water-resisting layer, the watering cart comprises a water tank, rollers are arranged at the lower end of the water tank, and the water tank is arranged on the water tank. Sprayers are arranged on the side face of the water tank. According to the highway engineering bridge construction bridge floor concrete curing device, the covering piece comprises the water storage layer and the water resisting layer, water is stored through the water storage layer, water slowly permeates into a concrete pavement, the water spraying frequency can be reduced, and the effects of heat preservation and moisture preservation are achieved.
本发明涉及一种公路工程桥梁施工桥面混凝土养护装置,包括覆盖片和洒水车,覆盖片包括蓄水层和隔水层,蓄水层为两层,两层蓄水层之间夹设隔水层,隔水层上设有透水孔,洒水车包括水箱,水箱下端设有滚轮,水箱上设有水箱,水箱上的侧面设有喷头。本发明提供的公路工程桥梁施工桥面混凝土养护装置,覆盖片包括蓄水层和隔水层,通过蓄水层储蓄水量,慢慢渗透到混凝土路面,不仅能减少洒水频次,而且具有保温保湿的功效。
Bridge deck concrete curing device for highway engineering bridge construction
一种公路工程桥梁施工桥面混凝土养护装置
ZHENG LIZHENG (author) / WANG PEI (author) / ZHAO CHUANJIE (author) / WU XIUFEI (author) / HAN HONG (author)
2022-11-29
Patent
Electronic Resource
Chinese
Bridge deck concrete curing device for highway engineering bridge construction
European Patent Office | 2024
|Bridge deck concrete curing device for highway engineering bridge construction
European Patent Office | 2023
|Bridge deck concrete curing device for highway engineering bridge construction
European Patent Office | 2022
|Bridge deck concrete curing device for highway engineering bridge construction
European Patent Office | 2024
|Bridge deck concrete curing device for highway engineering bridge construction
European Patent Office | 2021
|