A platform for research: civil engineering, architecture and urbanism
Construction support for rural construction project
The construction support for the rural construction project comprises a main frame, a supporting frame is fixedly installed on the front side of the main frame, a conveying assembly for conveying painting materials is installed on the upper side of the supporting frame, and an anti-falling assembly for preventing the materials from falling is arranged on one side of the conveying assembly. A lifting assembly capable of moving in a lifting mode is installed at one end of the supporting frame and the other side of the conveying assembly, guide rods are fixedly connected to the positions, close to the corners of the periphery, of the inner side of the main frame, the outer sides of the four sets of guide rods are movably sleeved with a lifting platform, and two sets of installation grooves are formed in the lower side of the main frame. According to the construction support for the rural construction project, through cooperation of the conveying assembly and the lifting assembly, up-down conveying of materials and workers is achieved, when the conveying assembly and the lifting assembly are used, the anti-falling assembly plays a protection role, and safety is improved.
本发明公开了一种乡村建设工程的施工支架,包括主架,所述主架的前侧固定安装有支撑架,所述支撑架的上侧安装有传送粉刷物料的传送组件,所述传送组件的一侧设置有防止物料坠落的防坠组件,所述支撑架的一端与传送组件的另一侧安装有升降移动的升降组件,所述主架的内侧靠近四周拐角处均固定连接有导向杆,四组所述导向杆的外侧活动套接有升降平台,所述主架的下侧内部开设有两组安装槽。本发明所述的一种乡村建设工程的施工支架,通过传送组件、升降组件之间配合,实现对材料与工人的上下输送,而防坠组件在传送组件、升降组件使用时,进行保护的作用,提高安全性。
Construction support for rural construction project
The construction support for the rural construction project comprises a main frame, a supporting frame is fixedly installed on the front side of the main frame, a conveying assembly for conveying painting materials is installed on the upper side of the supporting frame, and an anti-falling assembly for preventing the materials from falling is arranged on one side of the conveying assembly. A lifting assembly capable of moving in a lifting mode is installed at one end of the supporting frame and the other side of the conveying assembly, guide rods are fixedly connected to the positions, close to the corners of the periphery, of the inner side of the main frame, the outer sides of the four sets of guide rods are movably sleeved with a lifting platform, and two sets of installation grooves are formed in the lower side of the main frame. According to the construction support for the rural construction project, through cooperation of the conveying assembly and the lifting assembly, up-down conveying of materials and workers is achieved, when the conveying assembly and the lifting assembly are used, the anti-falling assembly plays a protection role, and safety is improved.
本发明公开了一种乡村建设工程的施工支架,包括主架,所述主架的前侧固定安装有支撑架,所述支撑架的上侧安装有传送粉刷物料的传送组件,所述传送组件的一侧设置有防止物料坠落的防坠组件,所述支撑架的一端与传送组件的另一侧安装有升降移动的升降组件,所述主架的内侧靠近四周拐角处均固定连接有导向杆,四组所述导向杆的外侧活动套接有升降平台,所述主架的下侧内部开设有两组安装槽。本发明所述的一种乡村建设工程的施工支架,通过传送组件、升降组件之间配合,实现对材料与工人的上下输送,而防坠组件在传送组件、升降组件使用时,进行保护的作用,提高安全性。
Construction support for rural construction project
一种乡村建设工程的施工支架
LIU XIAOJIE (author) / DAI CHUNHUA (author)
2022-11-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction project delivery cloud decision-support model
Online Contents | 2017
British Library Conference Proceedings | 2000
|A Review of Monitoring Construction Equipment in Support of Construction Project Management
DOAJ | 2022
|