Reinforcing construction method for improving bearing capacity of adjacent foundations
The invention relates to foundation construction, in particular to a reinforcement construction method for improving the bearing capacity of adjacent foundations. Comprising the following steps: step A, preparation work; b, the ground covering the original foundation and the supported foundation is broken, and the upper surface of the original foundation and the side face of the supported foundation are exposed; c, chiseling the foundation; d, steel bar planting and steel bar binding; e, a formwork is erected; f, after the connecting surface is cleaned and wetted, concrete is poured; and step G, basic recovery. The construction speed is high, the construction cost is reduced, the overall stability is improved, the bearing capacity of the foundation is improved, and the quality is guaranteed.
本发明涉及基础施工,特别是一种提高相邻基础承载力的加固施工方法。包括如下步骤:步骤A、准备工作;步骤B、将覆盖原有基础和被支撑基础上方的地面破除,露出原有基础的上表面和被支撑基础的侧面;步骤C、基础凿毛;步骤D、植筋、钢筋绑扎;步骤E、支设模板;步骤F、清理接茬面并润湿后,浇注混凝土;步骤G、基础恢复。本发明施工速度快,降低施工成本,提高整体稳定性,提高基础的承载力,保证质量。
Reinforcing construction method for improving bearing capacity of adjacent foundations
The invention relates to foundation construction, in particular to a reinforcement construction method for improving the bearing capacity of adjacent foundations. Comprising the following steps: step A, preparation work; b, the ground covering the original foundation and the supported foundation is broken, and the upper surface of the original foundation and the side face of the supported foundation are exposed; c, chiseling the foundation; d, steel bar planting and steel bar binding; e, a formwork is erected; f, after the connecting surface is cleaned and wetted, concrete is poured; and step G, basic recovery. The construction speed is high, the construction cost is reduced, the overall stability is improved, the bearing capacity of the foundation is improved, and the quality is guaranteed.
本发明涉及基础施工,特别是一种提高相邻基础承载力的加固施工方法。包括如下步骤:步骤A、准备工作;步骤B、将覆盖原有基础和被支撑基础上方的地面破除,露出原有基础的上表面和被支撑基础的侧面;步骤C、基础凿毛;步骤D、植筋、钢筋绑扎;步骤E、支设模板;步骤F、清理接茬面并润湿后,浇注混凝土;步骤G、基础恢复。本发明施工速度快,降低施工成本,提高整体稳定性,提高基础的承载力,保证质量。
Reinforcing construction method for improving bearing capacity of adjacent foundations
提高相邻基础承载力的加固施工方法
CHEN CHEN (author) / WANG DAIFA (author) / ZHANG TIANYU (author)
2022-12-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
British Library Conference Proceedings | 2009
|European Patent Office | 2022
|Bearing Capacity of Shallow Strip Foundations Adjacent to Slopes
British Library Conference Proceedings | 2022
|Reinforcing system for repairing defects and improving bearing capacity and construction method
European Patent Office | 2024
|