Continuous sleeper changing operation train and operation method
The embodiment of the invention provides a continuous sleeper changing operation train and an operation method, and the operation train comprises a railway ballast treatment vehicle and a sleeper changing operation vehicle; the railway ballast treatment vehicle is provided with a railway ballast treatment device; the railway ballast processing device is used for excavating and transporting railway ballasts on the two sides of the track, transferring the railway ballasts between sleepers to the two sides of the track and backfilling the railway ballasts to the inner side of the track after the sleeper replacement operation vehicle completes sleeper replacement. The sleeper changing operation vehicle is used for recycling old sleepers and laying new sleepers; the sleeper changing operation vehicle is provided with a rail lifting device which is used for lifting a steel rail away from a sleeper surface to be higher than a spike; according to the continuous sleeper replacement operation train and the operation method, rail cutting is not needed, replacement of multiple sleepers is completed at a time, integrated continuous operation is achieved, and the construction efficiency is high.
本申请实施例提供一种连续换枕作业列车及作业方法,其中,作业列车包括:道砟处理车及换枕作业车;道砟处理车安装有道砟处理装置;所述道砟处理装置用于挖掘并运输轨道两侧道砟,将轨枕间道砟转移至轨道两侧,并在换枕作业车完成换枕后将道砟回填至轨道内侧;换枕作业车用于回收旧轨枕和布放新轨枕;所述换枕作业车设置有提轨装置,所述提轨装置用于将钢轨抬离枕面高于道钉;本申请提供的连续换枕作业列车及作业方法无需切轨,一次完成多枕的更换,实现了一体化连续作业,施工效率高。
Continuous sleeper changing operation train and operation method
The embodiment of the invention provides a continuous sleeper changing operation train and an operation method, and the operation train comprises a railway ballast treatment vehicle and a sleeper changing operation vehicle; the railway ballast treatment vehicle is provided with a railway ballast treatment device; the railway ballast processing device is used for excavating and transporting railway ballasts on the two sides of the track, transferring the railway ballasts between sleepers to the two sides of the track and backfilling the railway ballasts to the inner side of the track after the sleeper replacement operation vehicle completes sleeper replacement. The sleeper changing operation vehicle is used for recycling old sleepers and laying new sleepers; the sleeper changing operation vehicle is provided with a rail lifting device which is used for lifting a steel rail away from a sleeper surface to be higher than a spike; according to the continuous sleeper replacement operation train and the operation method, rail cutting is not needed, replacement of multiple sleepers is completed at a time, integrated continuous operation is achieved, and the construction efficiency is high.
本申请实施例提供一种连续换枕作业列车及作业方法,其中,作业列车包括:道砟处理车及换枕作业车;道砟处理车安装有道砟处理装置;所述道砟处理装置用于挖掘并运输轨道两侧道砟,将轨枕间道砟转移至轨道两侧,并在换枕作业车完成换枕后将道砟回填至轨道内侧;换枕作业车用于回收旧轨枕和布放新轨枕;所述换枕作业车设置有提轨装置,所述提轨装置用于将钢轨抬离枕面高于道钉;本申请提供的连续换枕作业列车及作业方法无需切轨,一次完成多枕的更换,实现了一体化连续作业,施工效率高。
Continuous sleeper changing operation train and operation method
连续换枕作业列车及作业方法
LUO JIANLI (author) / TAO XIAOHU (author) / CHEN QINYUN (author) / TANG MINGMING (author) / WU YUXIANG (author) / ZHANG ZHONGJIAN (author) / HUANG QIONGYA (author)
2022-12-09
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
European Patent Office | 2024
|Continuous sleeper replacement operation vehicle and operation method thereof
European Patent Office | 2023
|Continuous sleeper collecting and releasing operation vehicle and operation method
European Patent Office | 2024
|Continuous rail changing operation train and operation method thereof
European Patent Office | 2015
|Continuous double-sleeper main line operation vehicle and operation method thereof
European Patent Office | 2023
|