A platform for research: civil engineering, architecture and urbanism
Floor slab hole plugging suspended formwork tool
The invention discloses a formwork hanging tool for plugging a floor hole, and relates to the technical field of building construction. According to the technical scheme, the device comprises an upper assembly and a lower assembly, the upper assembly and the lower assembly are connected through a water stop screw, the upper assembly comprises an ejector rod, at least two first penetrating through holes are evenly formed in the ejector rod, the end, close to the lower assembly, of the ejector rod is open, and a plurality of adjusting spaces are formed in the end, close to the lower assembly, of the ejector rod; first lead screws are inserted into the two ends of the ejector rod and are in threaded connection with the two ends of the ejector rod, connecting blocks are in threaded connection with the first lead screws, and one ends of the connecting blocks are attached to the inner surface of the ejector rod. The method has the advantages that the problem of plugging of the reserved hole can be solved, and the problem of water seepage can be effectively avoided.
本发明公开了一种楼板洞口封堵吊模工具,涉及建筑施工的技术领域。其技术要点是:包括上部组件和下部组件,且两者之间通过止水螺杆连接,所述上部组件包括顶杆,所述顶杆上均匀开设有至少两个第一贯穿通孔,所述顶杆的靠近下部组件一端开口设置,且内部设有若干调节空间,所述顶杆两端的内部均插设有第一丝杆且与第一丝杆螺纹连接,所述第一丝杆上螺纹连接有连接块,所述连接块一端贴合于所述顶杆的内表面。本发明可以解决预留洞口的封堵问题,并可有效的避免渗水问题的优点。
Floor slab hole plugging suspended formwork tool
The invention discloses a formwork hanging tool for plugging a floor hole, and relates to the technical field of building construction. According to the technical scheme, the device comprises an upper assembly and a lower assembly, the upper assembly and the lower assembly are connected through a water stop screw, the upper assembly comprises an ejector rod, at least two first penetrating through holes are evenly formed in the ejector rod, the end, close to the lower assembly, of the ejector rod is open, and a plurality of adjusting spaces are formed in the end, close to the lower assembly, of the ejector rod; first lead screws are inserted into the two ends of the ejector rod and are in threaded connection with the two ends of the ejector rod, connecting blocks are in threaded connection with the first lead screws, and one ends of the connecting blocks are attached to the inner surface of the ejector rod. The method has the advantages that the problem of plugging of the reserved hole can be solved, and the problem of water seepage can be effectively avoided.
本发明公开了一种楼板洞口封堵吊模工具,涉及建筑施工的技术领域。其技术要点是:包括上部组件和下部组件,且两者之间通过止水螺杆连接,所述上部组件包括顶杆,所述顶杆上均匀开设有至少两个第一贯穿通孔,所述顶杆的靠近下部组件一端开口设置,且内部设有若干调节空间,所述顶杆两端的内部均插设有第一丝杆且与第一丝杆螺纹连接,所述第一丝杆上螺纹连接有连接块,所述连接块一端贴合于所述顶杆的内表面。本发明可以解决预留洞口的封堵问题,并可有效的避免渗水问题的优点。
Floor slab hole plugging suspended formwork tool
一种楼板洞口封堵吊模工具
ZHENG ZHIHANG (author) / ZHAO JIANJUN (author) / ZHANG ZHE (author) / ZHANG QIXIN (author) / LIN JIAN (author) / LIN HUIYU (author)
2022-12-16
Patent
Electronic Resource
Chinese
Binding belt pre-embedding device for floor hole suspended formwork plugging and construction method
European Patent Office | 2022
|Floor pipeline reserved hole plugging formwork and construction method
European Patent Office | 2021
|Decorative integrated plugging method for reserved hole of floor slab with lower suspended structure
European Patent Office | 2022
|Concrete formwork and a formwork support bracket for forming a suspended floor slab
European Patent Office | 2020
|Concrete formwork and a formwork support bracket for forming a suspended floor slab
European Patent Office | 2019
|