A platform for research: civil engineering, architecture and urbanism
Navigation blocking dredging construction method under complex navigation environment
The invention belongs to the field of dredging construction methods, and particularly relates to a navigation sealing dredging construction method in a complex navigation environment, which comprises the following steps of: 1, constructing a navigation sealing area in blocks and regions, dividing the navigation sealing construction area into a preferential excavation area, a dredging area I and a dredging area II, and performing dredging engineering construction in blocks; 2, setting a warning ship and a temporary navigation mark to enclose the construction area to form a navigation sealing area; 3, setting a warning ship and a temporary navigation mark to enclose the construction area to form a navigation sealing area; 4, construction is conducted in blocks and areas; according to the method, the function of efficiently conducting dredging construction under the condition that safety is guaranteed is achieved through the steps from the first step to the fourth step, and the problems that most of existing dredging construction methods aim at water areas with the simple navigation environment, and construction safety and efficiency are low when construction is conducted on water areas with the complex navigation environment are solved.
本发明属于疏浚施工方法领域,具体的说是一种复杂通航环境下的封航疏浚施工方法,第一步:将封航区域分块分区施工,将封航的施工区域分为优先开挖区域、疏浚区一、疏浚区二,分块进行疏浚工程施工;第二步:设置警戒船和临时航标对施工区域进行围蔽形成封航区域;第三步:设置警戒船和临时航标对施工区域进行围蔽形成封航区域;第四步:分块分区施工;通过第一步到第四步方法流程,实现了在确保安全的情况下高效率的进行疏浚施工的功能,解决了现有的疏浚施工方法大都是针对通航环境较为简单的水域,在对通航环境较为复杂的水域进行施工时施工的安全性和效率较低的问题。
Navigation blocking dredging construction method under complex navigation environment
The invention belongs to the field of dredging construction methods, and particularly relates to a navigation sealing dredging construction method in a complex navigation environment, which comprises the following steps of: 1, constructing a navigation sealing area in blocks and regions, dividing the navigation sealing construction area into a preferential excavation area, a dredging area I and a dredging area II, and performing dredging engineering construction in blocks; 2, setting a warning ship and a temporary navigation mark to enclose the construction area to form a navigation sealing area; 3, setting a warning ship and a temporary navigation mark to enclose the construction area to form a navigation sealing area; 4, construction is conducted in blocks and areas; according to the method, the function of efficiently conducting dredging construction under the condition that safety is guaranteed is achieved through the steps from the first step to the fourth step, and the problems that most of existing dredging construction methods aim at water areas with the simple navigation environment, and construction safety and efficiency are low when construction is conducted on water areas with the complex navigation environment are solved.
本发明属于疏浚施工方法领域,具体的说是一种复杂通航环境下的封航疏浚施工方法,第一步:将封航区域分块分区施工,将封航的施工区域分为优先开挖区域、疏浚区一、疏浚区二,分块进行疏浚工程施工;第二步:设置警戒船和临时航标对施工区域进行围蔽形成封航区域;第三步:设置警戒船和临时航标对施工区域进行围蔽形成封航区域;第四步:分块分区施工;通过第一步到第四步方法流程,实现了在确保安全的情况下高效率的进行疏浚施工的功能,解决了现有的疏浚施工方法大都是针对通航环境较为简单的水域,在对通航环境较为复杂的水域进行施工时施工的安全性和效率较低的问题。
Navigation blocking dredging construction method under complex navigation environment
一种复杂通航环境下的封航疏浚施工方法
ZHANG JIYI (author) / TAN YONGXIANG (author) / MA TENGZHAN (author) / XU SHAOXIONG (author) / CHEN HUAFENG (author) / YU HUANZHANG (author) / CHEN HUALIN (author) / LI JINGJING (author)
2022-12-20
Patent
Electronic Resource
Chinese
Features - Salvage Assists Dredging, Navigation & the Environment
Online Contents | 1998
Navigation & Surveying Systems Related to Dredging and Marine Construction
British Library Conference Proceedings | 1991
|Dredging - The automatic integration of navigation and dredging duties.
Online Contents | 2002