A platform for research: civil engineering, architecture and urbanism
The invention discloses a floor tile paving construction method. The floor tile paving construction method comprises the steps of preparation, paving, filling and the like. Wherein in the preparation step, a plurality of floor tiles and bases are prepared, and the floor tiles are embedded and clamped into the bases one by one to form a plurality of tile seat units, then in the paving step, the tile seat units are paved side by side one by one to form gaps between the adjacent tile seat units, and finally in the filling step, the gaps between the adjacent tile seat units are filled. Filling the gaps with a gap filling material so as to form a flat state on the surfaces of the floor tiles; therefore, the tile seat units are closely arranged and are matched with the filling of the joint filling material, so that the floor tiles can be quickly laid, the construction speed is increased, the base can provide a buffering effect when the floor tiles are shrunk or expanded, the problem that the floor tiles are damaged is effectively avoided, and the overall construction quality is further improved.
本发明公开了一种地砖铺贴施工法,其包含有准备、铺贴及填补等步骤;其中,该准备步骤中备有多块地砖与底座,并将该等地砖逐一嵌卡入该等底座内,以形成多块砖座单元,接着于铺贴步骤中,将该等砖座单元逐一并排铺设,以使相邻的砖座单元间形成有间隙,最后于该填补步骤中,以填缝材料针对上述间隙进行填补,以使该等地砖表面形成一平整态样;是以,通过该等砖座单元间紧靠排列,配合该填缝材料的填补,以便快速完成地砖铺设,提升施工速度外,且该等底座于该等地砖产生收缩或膨胀时,得以提供缓冲效果,有效避免该等地砖损坏的问题发生,进而提升整体施工质量。
The invention discloses a floor tile paving construction method. The floor tile paving construction method comprises the steps of preparation, paving, filling and the like. Wherein in the preparation step, a plurality of floor tiles and bases are prepared, and the floor tiles are embedded and clamped into the bases one by one to form a plurality of tile seat units, then in the paving step, the tile seat units are paved side by side one by one to form gaps between the adjacent tile seat units, and finally in the filling step, the gaps between the adjacent tile seat units are filled. Filling the gaps with a gap filling material so as to form a flat state on the surfaces of the floor tiles; therefore, the tile seat units are closely arranged and are matched with the filling of the joint filling material, so that the floor tiles can be quickly laid, the construction speed is increased, the base can provide a buffering effect when the floor tiles are shrunk or expanded, the problem that the floor tiles are damaged is effectively avoided, and the overall construction quality is further improved.
本发明公开了一种地砖铺贴施工法,其包含有准备、铺贴及填补等步骤;其中,该准备步骤中备有多块地砖与底座,并将该等地砖逐一嵌卡入该等底座内,以形成多块砖座单元,接着于铺贴步骤中,将该等砖座单元逐一并排铺设,以使相邻的砖座单元间形成有间隙,最后于该填补步骤中,以填缝材料针对上述间隙进行填补,以使该等地砖表面形成一平整态样;是以,通过该等砖座单元间紧靠排列,配合该填缝材料的填补,以便快速完成地砖铺设,提升施工速度外,且该等底座于该等地砖产生收缩或膨胀时,得以提供缓冲效果,有效避免该等地砖损坏的问题发生,进而提升整体施工质量。
Floor tile paving construction method
地砖铺贴施工法
LU JUNDA (author)
2022-12-23
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Liner for floor tile paving and floor tile paving structure
European Patent Office | 2020
|