A platform for research: civil engineering, architecture and urbanism
Method and system for controlling ground cutting implement of machine
A method for controlling a ground cutting implement includes receiving, by a first controller, an input to actuate the ground cutting implement, and determining, by the first controller, a primary parameter associated with activation of a fluid regulating valve. The method includes receiving, by the first controller, data corresponding to a secondary parameter associated with activation of the flow control valve from the second controller. Further, the method includes activating, by the first controller, the fluid regulating valve, and transmitting a first instruction to the second controller to activate the flow control valve if each of the primary parameter and the secondary parameter satisfies a respective parameter threshold condition. The method further includes deactivating, by the first controller, the fluid regulating valve and transmitting a second command to the second controller to deactivate the flow control valve if any of the primary parameter or the secondary parameter violates any corresponding parameter threshold condition.
一种用于控制地面切割机具的方法,其包括通过第一控制器来接收致动地面切割机具的输入,以及通过第一控制器来确定与流体调节阀的启动相关联的一次参数。该方法包括通过第一控制器来从第二控制器接收对应于与流量控制阀的启动相关联的二次参数的数据。此外,该方法包括通过第一控制器来启动流体调节阀,并且如果一次参数和二次参数中的每一个都满足相应的参数阈值条件,则将第一指令传送到第二控制器,以便启动流量控制阀。该方法还包括通过第一控制器来停用流体调节阀,并且如果一次参数或二次参数中的任一个违反任何相应的参数阈值条件,则将第二指令传送到第二控制器,以便停用流量控制阀。
Method and system for controlling ground cutting implement of machine
A method for controlling a ground cutting implement includes receiving, by a first controller, an input to actuate the ground cutting implement, and determining, by the first controller, a primary parameter associated with activation of a fluid regulating valve. The method includes receiving, by the first controller, data corresponding to a secondary parameter associated with activation of the flow control valve from the second controller. Further, the method includes activating, by the first controller, the fluid regulating valve, and transmitting a first instruction to the second controller to activate the flow control valve if each of the primary parameter and the secondary parameter satisfies a respective parameter threshold condition. The method further includes deactivating, by the first controller, the fluid regulating valve and transmitting a second command to the second controller to deactivate the flow control valve if any of the primary parameter or the secondary parameter violates any corresponding parameter threshold condition.
一种用于控制地面切割机具的方法,其包括通过第一控制器来接收致动地面切割机具的输入,以及通过第一控制器来确定与流体调节阀的启动相关联的一次参数。该方法包括通过第一控制器来从第二控制器接收对应于与流量控制阀的启动相关联的二次参数的数据。此外,该方法包括通过第一控制器来启动流体调节阀,并且如果一次参数和二次参数中的每一个都满足相应的参数阈值条件,则将第一指令传送到第二控制器,以便启动流量控制阀。该方法还包括通过第一控制器来停用流体调节阀,并且如果一次参数或二次参数中的任一个违反任何相应的参数阈值条件,则将第二指令传送到第二控制器,以便停用流量控制阀。
Method and system for controlling ground cutting implement of machine
用于控制机器的地面切割机具的方法和系统
FRANTZ MATTHEW-DAVID S (author) / NIEUWSMA DEREK (author) / HENAUT ROBERT (author) / DOY NATHANIEL S (author)
2022-12-30
Patent
Electronic Resource
Chinese
METHOD AND SYSTEM FOR CONTROLLING GROUND CUTTING IMPLEMENT OF MACHINES
European Patent Office | 2022
|SYSTEM AND METHOD FOR CONTROLLING POSITION OF MACHINE IMPLEMENT
European Patent Office | 2016
|