A platform for research: civil engineering, architecture and urbanism
Rainproof scouring process for bridge construction
The invention relates to the technical field of bridge construction, in particular to a bridge construction rainproof process, which needs to prepare auxiliary materials: thin steel wires, glass fibers, plastic plates, concrete and a wood water chute, and is characterized by comprising the following steps: S1, preparing materials; s2, installing a thin steel wire; s3, glass fibers are installed, and each thin steel wire is wound with at least two woven glass fibers; s4, concrete pouring is conducted, specifically, the tops of the steel frame thin steel wires of the bridge treated in the S3 are welded to metal rods, and pouring is conducted from the two sides during pouring; s5, the thin steel wires are cut off; s6, the plastic plate is installed; s7, wood water guiding grooves are installed; through the arrangement of the steel wire ropes and the glass fibers, the effect of fixing concrete is achieved, in the using process, the plastic plate is laid on the upper portion to enable the concrete to be more effective, and the situation that under heavy rain washing, a large amount of concrete loses, and stability is insufficient is prevented.
本发明涉及桥梁施工技术领域,具体涉及一种桥梁施工防雨冲刷工艺桥梁施工防雨冲刷工艺,需要准备辅料:细钢丝、玻璃丝、塑胶板、混凝土以及木质导水槽,其特征在于,包括以下步骤:S1:材料准备;S2:细钢丝的安装;S3:玻璃丝的安装,且每根细钢丝上至少缠绕两根编制好的玻璃丝;S4:混凝土的浇筑,将S3中处理后的桥梁的钢架细钢丝顶部处焊接在金属杆上,然而浇筑时从两侧一起浇筑;S5:剪断细钢丝;S6:塑胶板的安装;S7:木质导水槽安装;经过钢丝绳以及玻璃丝的设置,实现对于固定混凝土的作用,并且在使用时经过上方铺设塑胶板使其更有效的混凝土,防止在大雨冲刷下大量的混凝土流失稳定性不足的情况发生。
Rainproof scouring process for bridge construction
The invention relates to the technical field of bridge construction, in particular to a bridge construction rainproof process, which needs to prepare auxiliary materials: thin steel wires, glass fibers, plastic plates, concrete and a wood water chute, and is characterized by comprising the following steps: S1, preparing materials; s2, installing a thin steel wire; s3, glass fibers are installed, and each thin steel wire is wound with at least two woven glass fibers; s4, concrete pouring is conducted, specifically, the tops of the steel frame thin steel wires of the bridge treated in the S3 are welded to metal rods, and pouring is conducted from the two sides during pouring; s5, the thin steel wires are cut off; s6, the plastic plate is installed; s7, wood water guiding grooves are installed; through the arrangement of the steel wire ropes and the glass fibers, the effect of fixing concrete is achieved, in the using process, the plastic plate is laid on the upper portion to enable the concrete to be more effective, and the situation that under heavy rain washing, a large amount of concrete loses, and stability is insufficient is prevented.
本发明涉及桥梁施工技术领域,具体涉及一种桥梁施工防雨冲刷工艺桥梁施工防雨冲刷工艺,需要准备辅料:细钢丝、玻璃丝、塑胶板、混凝土以及木质导水槽,其特征在于,包括以下步骤:S1:材料准备;S2:细钢丝的安装;S3:玻璃丝的安装,且每根细钢丝上至少缠绕两根编制好的玻璃丝;S4:混凝土的浇筑,将S3中处理后的桥梁的钢架细钢丝顶部处焊接在金属杆上,然而浇筑时从两侧一起浇筑;S5:剪断细钢丝;S6:塑胶板的安装;S7:木质导水槽安装;经过钢丝绳以及玻璃丝的设置,实现对于固定混凝土的作用,并且在使用时经过上方铺设塑胶板使其更有效的混凝土,防止在大雨冲刷下大量的混凝土流失稳定性不足的情况发生。
Rainproof scouring process for bridge construction
一种桥梁施工防雨冲刷工艺
LI QI (author) / LU KAI (author) / WANG LING (author) / WANG ZHENYA (author) / WANG HENG (author)
2022-12-30
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
River-crossing bridge resting equipment with rainproof function