A platform for research: civil engineering, architecture and urbanism
Construction method of cylindrical diving pool
According to the construction method of the cylindrical diving pool, a winch is arranged on a first-layer ring beam and used for overall downhill construction of an underground steel platform, and pouring of the cylindrical diving pool from top to bottom can be achieved through a formwork system of the underground steel platform; the steel platform support is arranged on the cylindrical underground diaphragm wall, and the oil cylinder assembly is arranged on the peripheral face of the regular polygon steel box girder, so that the dead weight of the underground steel platform can be converted from the stress state of the steel wire rope to the stress state of the steel platform support, and the safety of overall construction is improved; by integrating the pre-pressurized oil cylinder assembly, the working platform, the formwork system and the equipment platform on the underground steel platform, the frequency of mounting and dismounting of equipment facilities can be reduced, and the construction efficiency, the mechanization and automation level and the repeated utilization rate can be effectively improved.
本发明提供一种圆筒形潜水池的施工方法,在首层圈梁上设置卷扬机,用于地下钢平台的整体滑降施工,利用地下钢平台的模板系统,可以实现圆筒形潜水池由上至下的浇筑;通过在圆筒形地下连续墙上设置钢平台支座,以及在正多边形钢箱梁的外周面上设置所述油缸组件,可以实现地下钢平台自重由钢丝绳受力到由钢平台支座承受的受力状态转换,提高整体施工的安全性,通过将预加压力的油缸组件、作业平台、模板系统、设备平台集成在地下钢平台上,可以降低设备设施安拆频次,且能有效提高施工效率低、机械化和自动化水平以及重复利用率。
Construction method of cylindrical diving pool
According to the construction method of the cylindrical diving pool, a winch is arranged on a first-layer ring beam and used for overall downhill construction of an underground steel platform, and pouring of the cylindrical diving pool from top to bottom can be achieved through a formwork system of the underground steel platform; the steel platform support is arranged on the cylindrical underground diaphragm wall, and the oil cylinder assembly is arranged on the peripheral face of the regular polygon steel box girder, so that the dead weight of the underground steel platform can be converted from the stress state of the steel wire rope to the stress state of the steel platform support, and the safety of overall construction is improved; by integrating the pre-pressurized oil cylinder assembly, the working platform, the formwork system and the equipment platform on the underground steel platform, the frequency of mounting and dismounting of equipment facilities can be reduced, and the construction efficiency, the mechanization and automation level and the repeated utilization rate can be effectively improved.
本发明提供一种圆筒形潜水池的施工方法,在首层圈梁上设置卷扬机,用于地下钢平台的整体滑降施工,利用地下钢平台的模板系统,可以实现圆筒形潜水池由上至下的浇筑;通过在圆筒形地下连续墙上设置钢平台支座,以及在正多边形钢箱梁的外周面上设置所述油缸组件,可以实现地下钢平台自重由钢丝绳受力到由钢平台支座承受的受力状态转换,提高整体施工的安全性,通过将预加压力的油缸组件、作业平台、模板系统、设备平台集成在地下钢平台上,可以降低设备设施安拆频次,且能有效提高施工效率低、机械化和自动化水平以及重复利用率。
Construction method of cylindrical diving pool
一种圆筒形潜水池的施工方法
ZHOU HONG (author) / LONG LIBO (author) / WU LIANDING (author) / WANG BAOCHENG (author) / SHI CHEN (author) / YU YALEI (author) / SU YUMENG (author) / LI JIAWEI (author)
2022-12-30
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen