The invention discloses a waterproof construction process for a basement bottom plate and a side wall. The waterproof construction process comprises the following steps that S1, a base layer of a waterproof layer is checked and treated; s2, constructing on the surface of the plain concrete cushion layer to form an asphalt waterproof coating layer; a polystyrene board protection layer is laid on the surface of the side wall of the backfill soil; s3, a layer of asphalt waterproof coiled material in the plane direction is laid on the surface of the asphalt waterproof coating layer, and a layer of asphalt waterproof coiled material in the vertical face direction is laid on the surface of the polystyrene board protection layer; s4, a fine aggregate concrete protection layer is formed on the upper surface of the asphalt waterproof coiled material in the plane direction through pouring; s5, a plurality of ventilation pipelines are arranged above the fine aggregate concrete protection layer; and S6, a bottom plate and side walls are formed through pouring construction, and ports in the two ends of the ventilation pipeline communicate with the external space of the concrete. Airflow can be introduced into the ventilation pipeline, so that the airflow takes away underground water permeating into the basement concrete structure, and the problem of basement humidity is solved.
本申请公开了一种地下室底板、侧墙防水施工工艺,包括如下步骤:步骤S1:对防水层的基层进行检查和处理;步骤S2:在素混凝土垫层表面施工形成沥青防水涂料层;在回填土侧壁表面铺设一层聚苯乙烯板保护层;步骤S3:在沥青防水涂料层表面铺设一层平面方向的沥青防水卷材,在聚苯乙烯板保护层的表面铺设一层立面方向的沥青防水卷材;步骤S4:在平面方向的沥青防水卷材上表面浇筑形成细石混凝土保护层;步骤S5:在细石混凝土保护层上方布置多个透气管道;步骤S6:浇筑施工形成底板和侧墙,透气管道两端的端口连通混凝土的外部空间。本申请可通过对透气管道内通入气流,使气流带走渗入地下室混凝土结构的地下水,从而改善地下室潮湿的问题。
The invention discloses a waterproof construction process for a basement bottom plate and a side wall. The waterproof construction process comprises the following steps that S1, a base layer of a waterproof layer is checked and treated; s2, constructing on the surface of the plain concrete cushion layer to form an asphalt waterproof coating layer; a polystyrene board protection layer is laid on the surface of the side wall of the backfill soil; s3, a layer of asphalt waterproof coiled material in the plane direction is laid on the surface of the asphalt waterproof coating layer, and a layer of asphalt waterproof coiled material in the vertical face direction is laid on the surface of the polystyrene board protection layer; s4, a fine aggregate concrete protection layer is formed on the upper surface of the asphalt waterproof coiled material in the plane direction through pouring; s5, a plurality of ventilation pipelines are arranged above the fine aggregate concrete protection layer; and S6, a bottom plate and side walls are formed through pouring construction, and ports in the two ends of the ventilation pipeline communicate with the external space of the concrete. Airflow can be introduced into the ventilation pipeline, so that the airflow takes away underground water permeating into the basement concrete structure, and the problem of basement humidity is solved.
本申请公开了一种地下室底板、侧墙防水施工工艺,包括如下步骤:步骤S1:对防水层的基层进行检查和处理;步骤S2:在素混凝土垫层表面施工形成沥青防水涂料层;在回填土侧壁表面铺设一层聚苯乙烯板保护层;步骤S3:在沥青防水涂料层表面铺设一层平面方向的沥青防水卷材,在聚苯乙烯板保护层的表面铺设一层立面方向的沥青防水卷材;步骤S4:在平面方向的沥青防水卷材上表面浇筑形成细石混凝土保护层;步骤S5:在细石混凝土保护层上方布置多个透气管道;步骤S6:浇筑施工形成底板和侧墙,透气管道两端的端口连通混凝土的外部空间。本申请可通过对透气管道内通入气流,使气流带走渗入地下室混凝土结构的地下水,从而改善地下室潮湿的问题。
Waterproof construction process for basement bottom plate and side wall
一种地下室底板、侧墙防水施工工艺
SONG JUAN (author)
2022-12-30
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement bottom plate waterproof structure and construction process thereof
European Patent Office | 2021
|Construction method of basement bottom plate and outer wall waterproof structure