A platform for research: civil engineering, architecture and urbanism
Comprehensive pipe gallery hydraulic formwork trolley and construction method
The invention relates to the field of building construction, in particular to a comprehensive pipe gallery hydraulic formwork trolley and a construction method.The comprehensive pipe gallery hydraulic formwork trolley is characterized in that a jacking and supporting part is arranged between a rear dismantling formwork and a portal frame; the jacking and supporting component is matched with the rear-dismantled formwork to support a top plate of the pipe gallery, a sliding component is further arranged on the jacking and supporting component, and the jacking and supporting component is matched with the sliding component. After the inner mold trolley is demolded, in the process that the inner mold trolley slides out of the inner cavity of the pipe gallery and after the inner mold trolley slides out of the inner cavity of the pipe gallery, a top plate of the pipe gallery can be continuously supported, stress of the top plate of the pipe gallery is assisted before the top plate of the pipe gallery reaches enough strength, the risk that the top plate of the pipe gallery cracks after mold removal is reduced, and the service life of the top plate of the pipe gallery is prolonged. And therefore, the leakage risk of the pipe gallery in subsequent use is reduced.
本发明涉及建筑施工领域,特别是涉及一种综合管廊液压模板台车及施工方法,一种综合管廊液压模板台车,所述后拆模板与所述门架之间设置有顶撑部件,在所述内模台车脱模过程中,所述顶撑部件与所述后拆模板配合对管廊的顶板进行支撑,在所述顶撑部件上还设置有滑移部件,所述顶撑部件和所述滑移部件配合,在所述内模台车脱模后、所述内模台车滑移出管廊内部空腔的过程中及所述内模台车滑移出管廊内部空腔后,均能持续对管廊的顶板进行支撑,在管廊顶板达到足够强度之前辅助其受力,降低了拆模后管廊顶板开裂的风险,进而降低了管廊在后续使用中渗漏的风险。
Comprehensive pipe gallery hydraulic formwork trolley and construction method
The invention relates to the field of building construction, in particular to a comprehensive pipe gallery hydraulic formwork trolley and a construction method.The comprehensive pipe gallery hydraulic formwork trolley is characterized in that a jacking and supporting part is arranged between a rear dismantling formwork and a portal frame; the jacking and supporting component is matched with the rear-dismantled formwork to support a top plate of the pipe gallery, a sliding component is further arranged on the jacking and supporting component, and the jacking and supporting component is matched with the sliding component. After the inner mold trolley is demolded, in the process that the inner mold trolley slides out of the inner cavity of the pipe gallery and after the inner mold trolley slides out of the inner cavity of the pipe gallery, a top plate of the pipe gallery can be continuously supported, stress of the top plate of the pipe gallery is assisted before the top plate of the pipe gallery reaches enough strength, the risk that the top plate of the pipe gallery cracks after mold removal is reduced, and the service life of the top plate of the pipe gallery is prolonged. And therefore, the leakage risk of the pipe gallery in subsequent use is reduced.
本发明涉及建筑施工领域,特别是涉及一种综合管廊液压模板台车及施工方法,一种综合管廊液压模板台车,所述后拆模板与所述门架之间设置有顶撑部件,在所述内模台车脱模过程中,所述顶撑部件与所述后拆模板配合对管廊的顶板进行支撑,在所述顶撑部件上还设置有滑移部件,所述顶撑部件和所述滑移部件配合,在所述内模台车脱模后、所述内模台车滑移出管廊内部空腔的过程中及所述内模台车滑移出管廊内部空腔后,均能持续对管廊的顶板进行支撑,在管廊顶板达到足够强度之前辅助其受力,降低了拆模后管廊顶板开裂的风险,进而降低了管廊在后续使用中渗漏的风险。
Comprehensive pipe gallery hydraulic formwork trolley and construction method
一种综合管廊液压模板台车及施工方法
HU YUYANG (author) / JIANG PENG (author) / PENG JIANPING (author) / YU HONGTAO (author) / CHEN BINGYAN (author) / HE YUMIN (author) / MENG WENWU (author) / JIANG HEMING (author)
2023-01-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Self-propelled steel formwork trolley for comprehensive pipe gallery construction
European Patent Office | 2022
|Trolley formwork combination system for pipe gallery construction
European Patent Office | 2024
|Universal comprehensive pipe gallery construction trolley
European Patent Office | 2023
|Novel steel structure self-propelled pipe gallery formwork trolley
European Patent Office | 2020
|