A platform for research: civil engineering, architecture and urbanism
Efficient mounting structure for bridge steel structure
The invention relates to the technical field of bridge efficient installation structures, and discloses an efficient installation structure for a bridge steel structure, the efficient installation structure comprises a plurality of installation units and a bottom plate, the installation units are arranged on the two sides of the bottom plate, and each installation unit comprises two beams, two bearing columns, four inclined rods, four fixing devices, two inserting assemblies and two inserting bases. Two bearing columns are connected between the two beams in an inserted mode, inserting block combinations are arranged at the connecting positions of the beams and the bearing columns, inserting assemblies and inserting bases are arranged on the side edges of the two beams, installation bases are arranged in the middles of the side edges of the beams and the bearing columns, two inclined rods are connected to the installation bases in an inserted mode, and the fixing devices are connected with the installation bases together. The problems that the operation process is tedious, time and labor are wasted, and bridge steel is inconvenient to disassemble, replace or overhaul due to the fact that most existing steel structure bridges are welded through bridge steel are solved.
本发明涉及了桥梁高效安装结构技术领域,且公开了一种用于桥梁钢结构的高效安装结构,包括多个安装单元和底板,底板的两侧设置有多个安装单元,安装单元包括两个梁、两个承重柱、四个斜杆、四个固定装置、两个插接组件和两个插接座,两个梁之间插接有两个承重柱,梁和承重柱连接处设置有插块组合,两个梁的侧边设置有插接组件和插接座,梁和承重柱的侧边中部均设置有安装基座,安装基座上插接有两个斜杆,固定装置与安装基座连接在一起,以解决现有钢结构桥梁大多是使用桥梁钢进行焊接完成导致操作过程繁琐,费时费力,不便与对桥梁钢进行拆卸更换或检修的问题。
Efficient mounting structure for bridge steel structure
The invention relates to the technical field of bridge efficient installation structures, and discloses an efficient installation structure for a bridge steel structure, the efficient installation structure comprises a plurality of installation units and a bottom plate, the installation units are arranged on the two sides of the bottom plate, and each installation unit comprises two beams, two bearing columns, four inclined rods, four fixing devices, two inserting assemblies and two inserting bases. Two bearing columns are connected between the two beams in an inserted mode, inserting block combinations are arranged at the connecting positions of the beams and the bearing columns, inserting assemblies and inserting bases are arranged on the side edges of the two beams, installation bases are arranged in the middles of the side edges of the beams and the bearing columns, two inclined rods are connected to the installation bases in an inserted mode, and the fixing devices are connected with the installation bases together. The problems that the operation process is tedious, time and labor are wasted, and bridge steel is inconvenient to disassemble, replace or overhaul due to the fact that most existing steel structure bridges are welded through bridge steel are solved.
本发明涉及了桥梁高效安装结构技术领域,且公开了一种用于桥梁钢结构的高效安装结构,包括多个安装单元和底板,底板的两侧设置有多个安装单元,安装单元包括两个梁、两个承重柱、四个斜杆、四个固定装置、两个插接组件和两个插接座,两个梁之间插接有两个承重柱,梁和承重柱连接处设置有插块组合,两个梁的侧边设置有插接组件和插接座,梁和承重柱的侧边中部均设置有安装基座,安装基座上插接有两个斜杆,固定装置与安装基座连接在一起,以解决现有钢结构桥梁大多是使用桥梁钢进行焊接完成导致操作过程繁琐,费时费力,不便与对桥梁钢进行拆卸更换或检修的问题。
Efficient mounting structure for bridge steel structure
一种用于桥梁钢结构的高效安装结构
ZHANG ZHIWU (author) / ZHANG XINGJUN (author)
2023-01-06
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
External plate mounting structure of steel structure bridge
European Patent Office | 2023
|Steel structure bridge truss mounting system and mounting process
European Patent Office | 2022
|Steel structure bridge truss mounting construction method
European Patent Office | 2020
|Bridge support steel hoop structure and steel hoop structure mounting method
European Patent Office | 2024
|Bridge steel structure reinforcing device and mounting method
European Patent Office | 2024
|