A platform for research: civil engineering, architecture and urbanism
Construction lifting platform for building double-glass curtain wall
The construction lifting platform for the building double-glass curtain wall comprises a frame body, the frame body comprises a first support, a second support and a suspension, a guide wheel is slidably embedded in one end of the suspension, a sliding block is elastically embedded in the other end of the suspension, and the tail end, provided with the sliding block, of the suspension is clamped and matched with the first support; the sliding block is connected with the first support through a bolt, the sliding block and the guide wheel are connected and provided with a connecting rod, and when the guide wheel moves towards the interior of the suspension, the guide wheel pulls the sliding block to move towards the guide wheel through the connecting rod. If the bolt connection assembly is loosened, the guide wheel slides towards the interior of the suspension to generate a traction effect on the bolt, and finally the fastening effect is achieved; and if the bolt connection is stable and the bolt is loosened in the use process, the guide wheel can also automatically slide into the suspension so as to pull the bolt, so that no gap is generated between the bolt and the first bracket, and the stable and safe effects are realized.
本发明公开了一种建筑双玻幕墙用施工吊台,包括架体,所述架体包括第一支架、第二支架和悬架,所述悬架一端滑动嵌入设置有导向轮,所述悬架另一端弹性嵌入设置有滑动块,所述悬架设有滑动块的末端与第一支架卡接适配,且滑动块与第一支架通过螺栓相连,所述滑动块和所述导向轮连接设置有连杆,当导向轮向悬架内移动时,导向轮通过连杆牵引滑动块向导向轮方向移动。本发明如果螺栓连接装配的松动,则导向轮向悬架内滑动产生对螺栓的牵引效果,最终实现固紧的效果;而如果螺栓连接的稳定,使用过程中螺栓出现松动问题,则导向轮也可以自动的向悬架中滑动从而牵引螺栓,使得螺栓和第一支架之间配合不会产生间隙,从而实现稳定和安全的效果。
Construction lifting platform for building double-glass curtain wall
The construction lifting platform for the building double-glass curtain wall comprises a frame body, the frame body comprises a first support, a second support and a suspension, a guide wheel is slidably embedded in one end of the suspension, a sliding block is elastically embedded in the other end of the suspension, and the tail end, provided with the sliding block, of the suspension is clamped and matched with the first support; the sliding block is connected with the first support through a bolt, the sliding block and the guide wheel are connected and provided with a connecting rod, and when the guide wheel moves towards the interior of the suspension, the guide wheel pulls the sliding block to move towards the guide wheel through the connecting rod. If the bolt connection assembly is loosened, the guide wheel slides towards the interior of the suspension to generate a traction effect on the bolt, and finally the fastening effect is achieved; and if the bolt connection is stable and the bolt is loosened in the use process, the guide wheel can also automatically slide into the suspension so as to pull the bolt, so that no gap is generated between the bolt and the first bracket, and the stable and safe effects are realized.
本发明公开了一种建筑双玻幕墙用施工吊台,包括架体,所述架体包括第一支架、第二支架和悬架,所述悬架一端滑动嵌入设置有导向轮,所述悬架另一端弹性嵌入设置有滑动块,所述悬架设有滑动块的末端与第一支架卡接适配,且滑动块与第一支架通过螺栓相连,所述滑动块和所述导向轮连接设置有连杆,当导向轮向悬架内移动时,导向轮通过连杆牵引滑动块向导向轮方向移动。本发明如果螺栓连接装配的松动,则导向轮向悬架内滑动产生对螺栓的牵引效果,最终实现固紧的效果;而如果螺栓连接的稳定,使用过程中螺栓出现松动问题,则导向轮也可以自动的向悬架中滑动从而牵引螺栓,使得螺栓和第一支架之间配合不会产生间隙,从而实现稳定和安全的效果。
Construction lifting platform for building double-glass curtain wall
一种建筑双玻幕墙用施工吊台
LIU HAO (author) / SUN WEI (author) / ZHAO MINGMING (author) / LIU SHANSHAN (author)
2023-01-10
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|European Patent Office | 2022
|Lifting device for building solar electric glass curtain wall construction
European Patent Office | 2022
|Clamping lifting appliance for building glass curtain wall
European Patent Office | 2022
|Glass curtain wall construction hanging platform for green building system
European Patent Office | 2021
|