A platform for research: civil engineering, architecture and urbanism
Concrete building template with high sealing performance
The high-sealing-performance concrete building formwork comprises a bottom plate, a first side formwork body, a second side formwork body, inserting blocks and limiting rods, the first side formwork body is installed at the upper end of the bottom plate, the second side formwork body is connected to the side of the first side formwork body in an inserted mode, the inserting blocks are fixedly installed on the second side formwork body and the first side formwork body, and the limiting rods are fixedly installed on the second side formwork body and the first side formwork body. The inserting block is inserted into a limiting rod, and the limiting rod is fixedly mounted at the upper end of the bottom plate; the positioning holes are formed in the side edges of the bottom plate; and the supporting plate is fixedly installed on the side edges of the first side formwork and the second side formwork, a guiding lead screw is installed in the middle of the supporting plate in a penetrating mode, a clamping plate is installed on the guiding lead screw, and a protruding column is fixedly connected to the lower end of the clamping plate. According to the concrete building formwork with the high sealing performance, the sealing performance of the joints can be guaranteed in the using process, concrete slurry is prevented from leaking outwards, and meanwhile the building formwork can be conveniently separated from solidified concrete.
本发明公开了一种高密封性的混凝土建筑模板,包括底板、第一侧模板、第二侧模板、插接块和限位杆,所述底板的上端安装有第一侧模板,且第一侧模板的边侧插接有第二侧模板,所述第二侧模板和第一侧模板上均固定安装有插接块,且插接块插入在限位杆上,所述限位杆固定安装在底板的上端;还包括:开设在所述底板侧边的定位孔;支撑板,固定安装在所述第一侧模板和第二侧模板的侧边,所述支撑板的中部贯穿安装有导向丝杆,且导向丝杆上安装有卡接板,所述卡接板的下端固定连接有凸柱。该高密封性的混凝土建筑模板,能够在使用的过程中保证接缝处的密封性防止混凝土浆料外泄,同时能够方便建筑模板和凝固后的混凝土分离。
Concrete building template with high sealing performance
The high-sealing-performance concrete building formwork comprises a bottom plate, a first side formwork body, a second side formwork body, inserting blocks and limiting rods, the first side formwork body is installed at the upper end of the bottom plate, the second side formwork body is connected to the side of the first side formwork body in an inserted mode, the inserting blocks are fixedly installed on the second side formwork body and the first side formwork body, and the limiting rods are fixedly installed on the second side formwork body and the first side formwork body. The inserting block is inserted into a limiting rod, and the limiting rod is fixedly mounted at the upper end of the bottom plate; the positioning holes are formed in the side edges of the bottom plate; and the supporting plate is fixedly installed on the side edges of the first side formwork and the second side formwork, a guiding lead screw is installed in the middle of the supporting plate in a penetrating mode, a clamping plate is installed on the guiding lead screw, and a protruding column is fixedly connected to the lower end of the clamping plate. According to the concrete building formwork with the high sealing performance, the sealing performance of the joints can be guaranteed in the using process, concrete slurry is prevented from leaking outwards, and meanwhile the building formwork can be conveniently separated from solidified concrete.
本发明公开了一种高密封性的混凝土建筑模板,包括底板、第一侧模板、第二侧模板、插接块和限位杆,所述底板的上端安装有第一侧模板,且第一侧模板的边侧插接有第二侧模板,所述第二侧模板和第一侧模板上均固定安装有插接块,且插接块插入在限位杆上,所述限位杆固定安装在底板的上端;还包括:开设在所述底板侧边的定位孔;支撑板,固定安装在所述第一侧模板和第二侧模板的侧边,所述支撑板的中部贯穿安装有导向丝杆,且导向丝杆上安装有卡接板,所述卡接板的下端固定连接有凸柱。该高密封性的混凝土建筑模板,能够在使用的过程中保证接缝处的密封性防止混凝土浆料外泄,同时能够方便建筑模板和凝固后的混凝土分离。
Concrete building template with high sealing performance
一种高密封性的混凝土建筑模板
WANG YALING (author)
2023-01-13
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste