Construction and cyclic utilization method of reusable muck digestion field
According to the reusable muck absorption field construction and cyclic utilization method, the earth retaining dam is a gravity dam with the vertical completely-isolated construction joints, the dam blocks can be independent from one another through the construction joints, the forcible entry construction difficulty is reduced in the reuse stage, the cost-efficiency ratio of muck reuse is increased, and economic benefits are improved; according to the gravity dam, it can be guaranteed that after a certain dam block is broken, the adjacent dam blocks can still keep stable, and the safety of a reuse project is guaranteed. The pond slag filling body in the site has the characteristic of self-stabilization, the formation of separation grids can be ensured in a muck absorption stage, muck absorption blocks are reasonably divided, and the construction organization of site absorption work is facilitated; the reuse stage plays a role in isolation and protection, and the enclosure does not utilize the muck of the blocks temporarily, so that the safety of the soil sampling operation is ensured. According to the scheme, the processing plant is arranged in the digestion field, the digestion field can be used as a tedding field and a processing field, and land occupation is reduced.
本发明所设计的一种可复用的渣土消纳场建设及循环利用方法中的挡土坝为带竖向完全隔离施工缝的重力坝,施工缝可以确保各坝块之间相互独立,在复用阶段减少破拆施工难度,提高渣土复用的费效比,提高经济效益;重力坝可以保证在某坝块破拆后,相邻坝块仍然能够保持自身稳定,确保复用工程的安全。场地内的塘渣堆填体具有自稳的特点,渣土消纳阶段可以保证形成分隔网格,合理划分渣土消纳的区块,方便现场消纳工作的施工组织;复用阶段则起到了隔离保护的作用,围挡暂不利用区块的渣土,保证取土作业的安全。该方案中的加工厂房设置于消纳场内,可以利用消纳场本身作为翻晒场地、加工场地,减少了土地的占用。
Construction and cyclic utilization method of reusable muck digestion field
According to the reusable muck absorption field construction and cyclic utilization method, the earth retaining dam is a gravity dam with the vertical completely-isolated construction joints, the dam blocks can be independent from one another through the construction joints, the forcible entry construction difficulty is reduced in the reuse stage, the cost-efficiency ratio of muck reuse is increased, and economic benefits are improved; according to the gravity dam, it can be guaranteed that after a certain dam block is broken, the adjacent dam blocks can still keep stable, and the safety of a reuse project is guaranteed. The pond slag filling body in the site has the characteristic of self-stabilization, the formation of separation grids can be ensured in a muck absorption stage, muck absorption blocks are reasonably divided, and the construction organization of site absorption work is facilitated; the reuse stage plays a role in isolation and protection, and the enclosure does not utilize the muck of the blocks temporarily, so that the safety of the soil sampling operation is ensured. According to the scheme, the processing plant is arranged in the digestion field, the digestion field can be used as a tedding field and a processing field, and land occupation is reduced.
本发明所设计的一种可复用的渣土消纳场建设及循环利用方法中的挡土坝为带竖向完全隔离施工缝的重力坝,施工缝可以确保各坝块之间相互独立,在复用阶段减少破拆施工难度,提高渣土复用的费效比,提高经济效益;重力坝可以保证在某坝块破拆后,相邻坝块仍然能够保持自身稳定,确保复用工程的安全。场地内的塘渣堆填体具有自稳的特点,渣土消纳阶段可以保证形成分隔网格,合理划分渣土消纳的区块,方便现场消纳工作的施工组织;复用阶段则起到了隔离保护的作用,围挡暂不利用区块的渣土,保证取土作业的安全。该方案中的加工厂房设置于消纳场内,可以利用消纳场本身作为翻晒场地、加工场地,减少了土地的占用。
Construction and cyclic utilization method of reusable muck digestion field
一种可复用的渣土消纳场建设及循环利用方法
JIANG JIANLIANG (author) / ZHANG LIYONG (author) / GUAN RENQIU (author) / HU RONGRONG (author) / CHANG JINYUAN (author) / BIAN SHIHAI (author) / XIAO FANGQIU (author) / WANG SHAOLIANG (author) / LIU HUAJUN (author) / SHAO PENG (author)
2023-01-17
Patent
Electronic Resource
Chinese
Muck comprehensive resource utilization formula and process
European Patent Office | 2020
|Shield muck curing agent and resource utilization method thereof
European Patent Office | 2021
|