A platform for research: civil engineering, architecture and urbanism
Construction method of channel type counter-force pedestal
The invention discloses a construction method of a channel type counter-force pedestal. The construction method comprises the following steps: 1) releasing position lines of a channel and an anchor hole module; (2) binding bottom steel bars of the pedestal; 3) mounting a channel and an anchor hole module; (4) leveling and heightening; (5) pedestal middle steel bars located below the anchor holes are bound; (6) connecting anchor hole assemblies are installed, the connecting anchor hole assemblies are adopted to connect the left and right adjacent installation channels and anchor hole modules together, each channel and anchor hole module comprises a support, two rows of channels and a row of module anchor hole assemblies connected between the two rows of channels, and the module anchor hole assemblies and the channels are supported by the supports; the connecting anchor hole assembly and the module anchor hole assembly are the same in structure and comprise a vertically-arranged anchor hole, an upper cross beam and a lower cross beam, and the anchor hole is arranged in the middle and connected with the two cross beams through a horizontal supporting plate. (7) binding steel bars at the upper part of the pedestal, and sealing the channel and the anchor hole by using a cover plate; and (8) concrete is poured. The installation precision is high, and the construction speed is high.
本发明公开了一种道槽式反力台座施工方法,采用以下步骤:1)放出槽道及锚孔模块的位置线;2)绑扎台座的底部钢筋;3)安装槽道及锚孔模块;4)调平、调高;5)绑扎位于锚孔下方的台座中部钢筋;6)安装连接锚孔组件,并采用连接锚孔组件将左右相邻的两个安装槽道及锚孔模块连接在一起,槽道及锚孔模块包括支架、两行槽道以及连接在它们之间的一行模块锚孔组件,模块锚孔组件和槽道由支架支撑;连接锚孔组件与模块锚孔组件结构相同,包括竖直设置的锚孔和上下两根横梁,锚孔居中设置,与两根横梁通过水平支撑板连接;7)绑扎台座的上部钢筋,利用盖板将槽道和锚孔封闭;8)浇筑混凝土。本发明安装精度高,施工速度快。
Construction method of channel type counter-force pedestal
The invention discloses a construction method of a channel type counter-force pedestal. The construction method comprises the following steps: 1) releasing position lines of a channel and an anchor hole module; (2) binding bottom steel bars of the pedestal; 3) mounting a channel and an anchor hole module; (4) leveling and heightening; (5) pedestal middle steel bars located below the anchor holes are bound; (6) connecting anchor hole assemblies are installed, the connecting anchor hole assemblies are adopted to connect the left and right adjacent installation channels and anchor hole modules together, each channel and anchor hole module comprises a support, two rows of channels and a row of module anchor hole assemblies connected between the two rows of channels, and the module anchor hole assemblies and the channels are supported by the supports; the connecting anchor hole assembly and the module anchor hole assembly are the same in structure and comprise a vertically-arranged anchor hole, an upper cross beam and a lower cross beam, and the anchor hole is arranged in the middle and connected with the two cross beams through a horizontal supporting plate. (7) binding steel bars at the upper part of the pedestal, and sealing the channel and the anchor hole by using a cover plate; and (8) concrete is poured. The installation precision is high, and the construction speed is high.
本发明公开了一种道槽式反力台座施工方法,采用以下步骤:1)放出槽道及锚孔模块的位置线;2)绑扎台座的底部钢筋;3)安装槽道及锚孔模块;4)调平、调高;5)绑扎位于锚孔下方的台座中部钢筋;6)安装连接锚孔组件,并采用连接锚孔组件将左右相邻的两个安装槽道及锚孔模块连接在一起,槽道及锚孔模块包括支架、两行槽道以及连接在它们之间的一行模块锚孔组件,模块锚孔组件和槽道由支架支撑;连接锚孔组件与模块锚孔组件结构相同,包括竖直设置的锚孔和上下两根横梁,锚孔居中设置,与两根横梁通过水平支撑板连接;7)绑扎台座的上部钢筋,利用盖板将槽道和锚孔封闭;8)浇筑混凝土。本发明安装精度高,施工速度快。
Construction method of channel type counter-force pedestal
一种道槽式反力台座施工方法
WEI HEXIN (author) / GUO YING (author) / HE JIANCHAO (author) / SONG QINGPU (author) / ZHANG ZHENYU (author)
2023-01-17
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|European Patent Office | 2023
|