A platform for research: civil engineering, architecture and urbanism
Ancient building caisson repairing equipment and repairing construction method
The invention discloses historic building caisson repairing equipment and a repairing construction method.The repairing equipment comprises a base, a supporting assembly is installed at the top end of the base, a hydraulic lifting machine is installed at the top end of the base, a supporting frame is installed at the top end of the hydraulic lifting machine, a material collecting groove plate is welded to the top end of the supporting frame, and a stabilizing frame is installed at the top end of the material collecting groove plate; a fixing column is placed in the middle of the top end of the stabilizing frame, a hydraulic supporting arm is installed on the outer side of the fixing column, and a hydraulic tappet is installed on the top of the hydraulic supporting arm. The hydraulic tappet can be controlled to rise according to the actual deformation condition of the stress beam, so that the threaded supporting rod is supported at the bottom of the stress beam through the rubber pad, the whole caisson can be supported at the moment, the caisson does not need to be disassembled when the caisson of the historic building is repaired, the caisson repairing steps and time are shortened, and the caisson repairing efficiency is improved.
本发明公开了一种古建筑藻井修复设备及修复施工方法,所述修复设备包括底座,底座的顶端安装有支撑组件,底座的顶端安装有液压升降机,液压升降机的顶端安装有支撑架,支撑架的顶端焊接有收料槽板,收料槽板的顶端安装有稳定架,稳定架的顶端中部位置处放置有固定柱,固定柱的外侧安装有液压支臂,液压支臂的顶部位置处安装有液压挺杆。本发明可根据受力梁的实际形变情况控制液压挺杆升起,从而将螺纹支撑杆通过橡胶垫支撑在受力梁的底部位置处,此时可以将整个藻井撑起,在进行古建筑藻井修复时不用拆卸藻井,缩短藻井修复的步骤和时间,从而提升藻井修复效率。
Ancient building caisson repairing equipment and repairing construction method
The invention discloses historic building caisson repairing equipment and a repairing construction method.The repairing equipment comprises a base, a supporting assembly is installed at the top end of the base, a hydraulic lifting machine is installed at the top end of the base, a supporting frame is installed at the top end of the hydraulic lifting machine, a material collecting groove plate is welded to the top end of the supporting frame, and a stabilizing frame is installed at the top end of the material collecting groove plate; a fixing column is placed in the middle of the top end of the stabilizing frame, a hydraulic supporting arm is installed on the outer side of the fixing column, and a hydraulic tappet is installed on the top of the hydraulic supporting arm. The hydraulic tappet can be controlled to rise according to the actual deformation condition of the stress beam, so that the threaded supporting rod is supported at the bottom of the stress beam through the rubber pad, the whole caisson can be supported at the moment, the caisson does not need to be disassembled when the caisson of the historic building is repaired, the caisson repairing steps and time are shortened, and the caisson repairing efficiency is improved.
本发明公开了一种古建筑藻井修复设备及修复施工方法,所述修复设备包括底座,底座的顶端安装有支撑组件,底座的顶端安装有液压升降机,液压升降机的顶端安装有支撑架,支撑架的顶端焊接有收料槽板,收料槽板的顶端安装有稳定架,稳定架的顶端中部位置处放置有固定柱,固定柱的外侧安装有液压支臂,液压支臂的顶部位置处安装有液压挺杆。本发明可根据受力梁的实际形变情况控制液压挺杆升起,从而将螺纹支撑杆通过橡胶垫支撑在受力梁的底部位置处,此时可以将整个藻井撑起,在进行古建筑藻井修复时不用拆卸藻井,缩短藻井修复的步骤和时间,从而提升藻井修复效率。
Ancient building caisson repairing equipment and repairing construction method
一种古建筑藻井修复设备及修复施工方法
JIANG QINQUAN (author) / LI ZEPING (author) / KANG GUANGSEN (author) / JIANG XIYAN (author) / CHEN DEMING (author) / WU XIAOLING (author)
2023-01-17
Patent
Electronic Resource
Chinese
Ancient building bearing column connection repairing structure and repairing method
European Patent Office | 2023
|Ancient building repairing equipment convenient to adjust
European Patent Office | 2023
|