A platform for research: civil engineering, architecture and urbanism
Steel-plastic shaping building template
The invention is applicable to the technical field of building templates, and provides a steel-plastic shaped building template, and connecting mechanisms are arranged at the joint of a first building template and a second building template and the joint of the second building template and a third building template; partition plates are arranged in the first building formwork, the second building formwork and the third building formwork correspondingly, and fixing mechanisms are arranged on the front surfaces and the rear surfaces of the partition plates correspondingly. A mounting plate is connected to one side of the first building formwork in a clamped mode, and a troweling plate is arranged on one side of the mounting plate. According to the building template, a trowelling plate can move on the upper surfaces of the first building template, the second building template and the third building template through work of a first electric telescopic rod, so that cement in the first building template, the second building template and the third building template can be trowelled; the first building formwork, the second building formwork and the third building formwork are prevented from being polluted, and the cement pouring quality can be improved.
本发明适用于建筑模板技术领域,提供了一种钢塑定型建筑模板,所述第一建筑模板和第二建筑模板的连接处以及第二建筑模板和第三建筑模板的连接处均设置有连接机构;所述第一建筑模板、第二建筑模板和第三建筑模板的内部均设置有隔板,所述隔板的前表面与后表面均设置有固定机构;所述第一建筑模板的一侧卡接有安装板,所述安装板的一侧设置有抹平板。本发明利用第一电动伸缩杆的工作会使得抹平板在第一建筑模板、第二建筑模板以及第三建筑模板的上表面移动,这样即可将第一建筑模板、第二建筑模板以及第三建筑模板内部的水泥进行抹平,避免污染第一建筑模板、第二建筑模板以及第三建筑模板,并能够提高水泥的浇注质量。
Steel-plastic shaping building template
The invention is applicable to the technical field of building templates, and provides a steel-plastic shaped building template, and connecting mechanisms are arranged at the joint of a first building template and a second building template and the joint of the second building template and a third building template; partition plates are arranged in the first building formwork, the second building formwork and the third building formwork correspondingly, and fixing mechanisms are arranged on the front surfaces and the rear surfaces of the partition plates correspondingly. A mounting plate is connected to one side of the first building formwork in a clamped mode, and a troweling plate is arranged on one side of the mounting plate. According to the building template, a trowelling plate can move on the upper surfaces of the first building template, the second building template and the third building template through work of a first electric telescopic rod, so that cement in the first building template, the second building template and the third building template can be trowelled; the first building formwork, the second building formwork and the third building formwork are prevented from being polluted, and the cement pouring quality can be improved.
本发明适用于建筑模板技术领域,提供了一种钢塑定型建筑模板,所述第一建筑模板和第二建筑模板的连接处以及第二建筑模板和第三建筑模板的连接处均设置有连接机构;所述第一建筑模板、第二建筑模板和第三建筑模板的内部均设置有隔板,所述隔板的前表面与后表面均设置有固定机构;所述第一建筑模板的一侧卡接有安装板,所述安装板的一侧设置有抹平板。本发明利用第一电动伸缩杆的工作会使得抹平板在第一建筑模板、第二建筑模板以及第三建筑模板的上表面移动,这样即可将第一建筑模板、第二建筑模板以及第三建筑模板内部的水泥进行抹平,避免污染第一建筑模板、第二建筑模板以及第三建筑模板,并能够提高水泥的浇注质量。
Steel-plastic shaping building template
一种钢塑定型建筑模板
FENG JINPING (author) / ZHAO XIONG (author)
2023-01-20
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste