Construction method of super high-rise glass curtain wall
The invention relates to a super high-rise glass curtain wall construction method which comprises the following steps: 1, lofting and calculating the height of a stand column, releasing the position of the stand column according to a design drawing, calculating the height of the stand column, and measuring the spacing size of embedded parts; 2, assembling the stand columns, specifically, assembling the customized aluminum alloy assemblies and the customized steel through stand columns according to the assembly large sample drawing, and assembling the stand columns; 3, mounting a stand column, namely drilling a hole in the position of the embedded part to mount a first adapter, connecting and mounting the stand column on the first adapter, adjusting the perpendicularity of the stand column, and then locking the stand column; 4, installing the cross beam, drilling holes in the stand columns according to the pre-embedded position of the cross beam, installing the cross beam, adjusting the horizontal position of the cross beam, and then locking; 5, mounting the glass plates, mounting the glass plates on the stand columns and the cross beams, leveling the glass plates indoors and outdoors, and then fixing the glass plates by using pressing plates; sixthly, sealing and gluing are conducted, the distance between the glass plates and the flatness are rechecked, then seams are filled and leveled up, and then sealing and gluing are conducted.
本发明涉及一种超高层玻璃幕墙施工方法,包括如下步骤:一、放样及计算立柱高度,根据设计图纸放出立柱位置、计算立柱高度,测量预埋件间距尺寸;二、立柱组装,根据发明组装大样图进行定制铝合金组件及定制钢通立柱组装,组装成立柱;三、立柱安装,在预埋件位置钻孔安装第一转接件,将立柱连接安装在第一转接件上,调整立柱垂直度,然后将立柱进行锁紧;四、横梁安装,根据横梁的预埋位置在立柱上钻孔,安装横梁,调整横梁水平位置,然后进行锁定;五、玻璃板块安装,安装玻璃板块到立柱及横梁上,对玻璃板块进行室内外调平,然后使用压板进行固定;六、密封打胶,复核玻璃板块之间的距离及平整度,之后在接缝处中进行填平,然后密封打胶。
Construction method of super high-rise glass curtain wall
The invention relates to a super high-rise glass curtain wall construction method which comprises the following steps: 1, lofting and calculating the height of a stand column, releasing the position of the stand column according to a design drawing, calculating the height of the stand column, and measuring the spacing size of embedded parts; 2, assembling the stand columns, specifically, assembling the customized aluminum alloy assemblies and the customized steel through stand columns according to the assembly large sample drawing, and assembling the stand columns; 3, mounting a stand column, namely drilling a hole in the position of the embedded part to mount a first adapter, connecting and mounting the stand column on the first adapter, adjusting the perpendicularity of the stand column, and then locking the stand column; 4, installing the cross beam, drilling holes in the stand columns according to the pre-embedded position of the cross beam, installing the cross beam, adjusting the horizontal position of the cross beam, and then locking; 5, mounting the glass plates, mounting the glass plates on the stand columns and the cross beams, leveling the glass plates indoors and outdoors, and then fixing the glass plates by using pressing plates; sixthly, sealing and gluing are conducted, the distance between the glass plates and the flatness are rechecked, then seams are filled and leveled up, and then sealing and gluing are conducted.
本发明涉及一种超高层玻璃幕墙施工方法,包括如下步骤:一、放样及计算立柱高度,根据设计图纸放出立柱位置、计算立柱高度,测量预埋件间距尺寸;二、立柱组装,根据发明组装大样图进行定制铝合金组件及定制钢通立柱组装,组装成立柱;三、立柱安装,在预埋件位置钻孔安装第一转接件,将立柱连接安装在第一转接件上,调整立柱垂直度,然后将立柱进行锁紧;四、横梁安装,根据横梁的预埋位置在立柱上钻孔,安装横梁,调整横梁水平位置,然后进行锁定;五、玻璃板块安装,安装玻璃板块到立柱及横梁上,对玻璃板块进行室内外调平,然后使用压板进行固定;六、密封打胶,复核玻璃板块之间的距离及平整度,之后在接缝处中进行填平,然后密封打胶。
Construction method of super high-rise glass curtain wall
一种超高层玻璃幕墙施工方法
ZHOU GUANGCHUN (author) / XU QI (author) / WANG YINGGE (author) / YOU JUNQIANG (author) / CHEN LIANG (author) / MIN LIHUA (author) / MIN TINGCHAO (author)
2023-01-20
Patent
Electronic Resource
Chinese
Construction method of super high-rise component type smart glass curtain wall
European Patent Office | 2015
|Super high-rise inhaul cable curtain wall glass clamp and curtain wall glass installation method
European Patent Office | 2020
|Construction method of super high-rise aerial curtain wall
European Patent Office | 2023
|Construction method for aluminum alloy glass curtain wall of super high-rise building
European Patent Office | 2023
|High-rise building curtain wall glass installation construction method
European Patent Office | 2021
|