Lifting construction method for correcting elevation of steel corridor
The invention discloses a lifting construction method for correcting the elevation of a steel corridor. The lifting construction method comprises the steps that A, a jacking bracket is fixedly installed on a steel gallery to be lifted and constructed, and a jack is fixedly installed on the jacking bracket; b, the jack is made to conduct jacking advancing till the steel corridor is jacked to the preset elevation; and C, the supporting steel columns are installed on the bottom face of the steel corridor so as to support the steel corridor. According to the lifting construction method, the overall lifting height of the steel corridor can be effectively and accurately controlled, the elevation problem of the steel corridor is efficiently and conveniently corrected, the method is economical and practical, the construction cost is effectively reduced, and the method is suitable for solving the elevation deviation problem generated in the construction process of the steel corridor on a construction site.
本申请公开了校正钢连廊标高的提升施工方法。该提升施工方法包括:A、使顶升牛腿固定安装在待提升施工的钢连廊上,使千斤顶固定安装在顶升牛腿上;B、使千斤顶产生顶升行进,直至顶升钢连廊至预定标高;C、使支撑钢柱安装在钢连廊的底面,以形成对钢连廊的支撑。本提升施工方法能够有效精准控制钢连廊整体提升高度,高效便捷校正钢连廊标高问题,经济实用,有效降低施工成本,适合于处理建筑工地钢连廊施工过程中所产生的标高偏差问题。
Lifting construction method for correcting elevation of steel corridor
The invention discloses a lifting construction method for correcting the elevation of a steel corridor. The lifting construction method comprises the steps that A, a jacking bracket is fixedly installed on a steel gallery to be lifted and constructed, and a jack is fixedly installed on the jacking bracket; b, the jack is made to conduct jacking advancing till the steel corridor is jacked to the preset elevation; and C, the supporting steel columns are installed on the bottom face of the steel corridor so as to support the steel corridor. According to the lifting construction method, the overall lifting height of the steel corridor can be effectively and accurately controlled, the elevation problem of the steel corridor is efficiently and conveniently corrected, the method is economical and practical, the construction cost is effectively reduced, and the method is suitable for solving the elevation deviation problem generated in the construction process of the steel corridor on a construction site.
本申请公开了校正钢连廊标高的提升施工方法。该提升施工方法包括:A、使顶升牛腿固定安装在待提升施工的钢连廊上,使千斤顶固定安装在顶升牛腿上;B、使千斤顶产生顶升行进,直至顶升钢连廊至预定标高;C、使支撑钢柱安装在钢连廊的底面,以形成对钢连廊的支撑。本提升施工方法能够有效精准控制钢连廊整体提升高度,高效便捷校正钢连廊标高问题,经济实用,有效降低施工成本,适合于处理建筑工地钢连廊施工过程中所产生的标高偏差问题。
Lifting construction method for correcting elevation of steel corridor
校正钢连廊标高的提升施工方法
HU RONGYAO (author) / GONG JUN (author) / WANG JIAYUAN (author) / XIE TIANDE (author) / ZHANG KANGSHENG (author)
2023-01-20
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel corridor lifting installation method and lifting device
European Patent Office | 2022
|European Patent Office | 2023
|Steel strand installation method for overall space corridor lifting construction
European Patent Office | 2015
|Large-span overweight steel corridor suspended platform lifting device and construction method
European Patent Office | 2024
|