A platform for research: civil engineering, architecture and urbanism
Steel strand double-anchor fixing device and mounting method
The invention relates to the technical field of building construction, and discloses a steel strand double-anchor fixing device and an installation method, the steel strand double-anchor fixing device is used for fastening a steel strand, the steel strand double-anchor fixing device comprises an upper anchor plate and a lower anchor plate, the steel strand sequentially penetrates through the upper anchor plate and the lower anchor plate, and fastening devices are arranged at the top of the upper anchor plate and the bottom of the lower anchor plate. The fastening device comprises a top fastening device body and a bottom fastening device body, the top fastening device body is arranged at the top of the upper anchor plate, the bottom fastening device body is arranged at the bottom of the lower anchor plate, and the problems that when the prestress of an existing anchorage device is increased, the tensioning effect is not ideal, and the center of gravity shifts and supports warp easily are solved. And certain potential safety hazards exist.
本发明涉及建筑施工技术领域,公开了一种钢绞线双锚固定装置及安装方法,用于钢绞线的紧固,包括上锚板和下锚板,所述钢绞线依次穿过上锚板和下锚板,所述上锚板顶部和下锚板底部均设置有紧固装置,所述紧固装置包括顶部紧固装置和底部紧固装置,所述顶部紧固装置设置于上锚板顶部,所述底部紧固装置设置于下锚板底部,解决了现有锚具在预应力加大时张拉效果不理想,容易导致重心偏移、支座翘曲的现象,具有一定安全隐患的技术问题。
Steel strand double-anchor fixing device and mounting method
The invention relates to the technical field of building construction, and discloses a steel strand double-anchor fixing device and an installation method, the steel strand double-anchor fixing device is used for fastening a steel strand, the steel strand double-anchor fixing device comprises an upper anchor plate and a lower anchor plate, the steel strand sequentially penetrates through the upper anchor plate and the lower anchor plate, and fastening devices are arranged at the top of the upper anchor plate and the bottom of the lower anchor plate. The fastening device comprises a top fastening device body and a bottom fastening device body, the top fastening device body is arranged at the top of the upper anchor plate, the bottom fastening device body is arranged at the bottom of the lower anchor plate, and the problems that when the prestress of an existing anchorage device is increased, the tensioning effect is not ideal, and the center of gravity shifts and supports warp easily are solved. And certain potential safety hazards exist.
本发明涉及建筑施工技术领域,公开了一种钢绞线双锚固定装置及安装方法,用于钢绞线的紧固,包括上锚板和下锚板,所述钢绞线依次穿过上锚板和下锚板,所述上锚板顶部和下锚板底部均设置有紧固装置,所述紧固装置包括顶部紧固装置和底部紧固装置,所述顶部紧固装置设置于上锚板顶部,所述底部紧固装置设置于下锚板底部,解决了现有锚具在预应力加大时张拉效果不理想,容易导致重心偏移、支座翘曲的现象,具有一定安全隐患的技术问题。
Steel strand double-anchor fixing device and mounting method
一种钢绞线双锚固定装置及安装方法
WANG TONGHUA (author) / ZHANG LONGGANG (author) / ZHANG QIANG (author)
2023-01-24
Patent
Electronic Resource
Chinese
Multi-strand anchor cable mounting trolley and anchor cable mounting construction method
European Patent Office | 2024
|