A platform for research: civil engineering, architecture and urbanism
Concrete double-groove blanking device
A concrete double-groove blanking device comprises a hopper (1), a guide groove (3), a material receiving opening (2) and a rotating assembly which are arranged from bottom to top. The number of the hoppers (1) is two, the number of the guide grooves (3) is two, the lower portion of one guide groove (3) is provided with a discharge port (31) vertically corresponding to the top opening position of one hopper (1), and the lower portion of the other guide groove (3) is provided with a left discharge port (31) and a right discharge port (31) vertically corresponding to the top opening positions of the two hoppers (1) respectively. The rotating assembly drives the guide groove (3) to rotate, and materials enter the guide groove (3) from the material receiving opening (2) and fall into the hopper (1) along a discharging opening (31) of the guide groove (3). According to the concrete double-groove discharging device, concrete can be discharged to one or two hoppers at the same time according to the demanded quantity of the concrete, it can be guaranteed that the concrete is supplied in time, meanwhile, waste is avoided, and time and material cost can be saved.
一种混凝土双槽落料装置,包括:由下至上设置的料斗(1)、导向槽(3)和接料口(2),转动组件;所述料斗(1)和导向槽(3)各设有左右两个,其中一个导向槽(3)下部设有与其中一个料斗(1)的顶部开口位置垂直对应的出料口(31)、另一个导向槽(3)下部设有分别与两个料斗(1)的顶部开口位置垂直对应的左右两个出料口(31);所述转动组件带动导向槽(3)转动,物料从所述接料口(2)进入导向槽(3)并沿导向槽(3)的出料口(31)落入料斗(1)内。本发明的混凝土双槽落料装置可根据混凝土的需求量给一个或两个料斗同时下混凝土,可保证混凝土的及时供给,同时避免浪费,有利于节约时间和材料成本。
Concrete double-groove blanking device
A concrete double-groove blanking device comprises a hopper (1), a guide groove (3), a material receiving opening (2) and a rotating assembly which are arranged from bottom to top. The number of the hoppers (1) is two, the number of the guide grooves (3) is two, the lower portion of one guide groove (3) is provided with a discharge port (31) vertically corresponding to the top opening position of one hopper (1), and the lower portion of the other guide groove (3) is provided with a left discharge port (31) and a right discharge port (31) vertically corresponding to the top opening positions of the two hoppers (1) respectively. The rotating assembly drives the guide groove (3) to rotate, and materials enter the guide groove (3) from the material receiving opening (2) and fall into the hopper (1) along a discharging opening (31) of the guide groove (3). According to the concrete double-groove discharging device, concrete can be discharged to one or two hoppers at the same time according to the demanded quantity of the concrete, it can be guaranteed that the concrete is supplied in time, meanwhile, waste is avoided, and time and material cost can be saved.
一种混凝土双槽落料装置,包括:由下至上设置的料斗(1)、导向槽(3)和接料口(2),转动组件;所述料斗(1)和导向槽(3)各设有左右两个,其中一个导向槽(3)下部设有与其中一个料斗(1)的顶部开口位置垂直对应的出料口(31)、另一个导向槽(3)下部设有分别与两个料斗(1)的顶部开口位置垂直对应的左右两个出料口(31);所述转动组件带动导向槽(3)转动,物料从所述接料口(2)进入导向槽(3)并沿导向槽(3)的出料口(31)落入料斗(1)内。本发明的混凝土双槽落料装置可根据混凝土的需求量给一个或两个料斗同时下混凝土,可保证混凝土的及时供给,同时避免浪费,有利于节约时间和材料成本。
Concrete double-groove blanking device
混凝土双槽落料装置
HUANG TIANXIANG (author) / HUANG HUIMIN (author)
2023-01-31
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B65D
Behältnisse zur Lagerung oder zum Transport von Gegenständen oder Materialien [Container], z.B. Säcke, Beutel, Fässer, Flaschen, Dosen, Kästen, Büchsen, Schachteln, Packkörbe, Tonnen, Gläser, Flüssigkeitsbehälter, Trichtersilos, Transportbehälter
,
CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS
Controllable and adjustable blanking groove of asphalt pavement maintenance truck
European Patent Office | 2022
|Coconut fiber reinforced coral aggregate concrete blanking device
European Patent Office | 2024
|Groove milling device and double-wheel groove milling machine
European Patent Office | 2023
|Concrete pouring blanking monitoring method, device and equipment and medium
European Patent Office | 2023
|