A platform for research: civil engineering, architecture and urbanism
Blind guide mark and installation method
The invention discloses a blind guide mark and an installation method and relates to the field of blind guide marks. The tail end of a column foot of the blind guide mark is connected with a bottom basin, the upper portion of the bottom basin and the lower portion of the mark form an annular space capable of containing resin, and the diameter of the bottom basin is more than one time larger than the diameter of the column foot or not smaller than half of the diameter of a mark body. According to the mounting method disclosed by the invention, the blind guide mark can be stably fixed on the ground only by drilling a wide and shallow hole in the surface of the ground material and injecting the resin without drilling tiles on the ground and drilling the back surface of the stone.
一种盲导标示及安装方法,涉及盲导标示领域。盲导标示,标示的柱脚末端连接一个底盆,底盆的上方与标示的下方形成可容纳树脂的环形空间,底盆的直径大于柱脚的直径一倍以上,或不少于标示本体直径的一半。本发明的安装方法,无需把地面上的砖瓦钻穿及钻透石材背面,只需在地材表面上钻一个宽和浅的孔洞,及注入树脂便能令盲导标示稳固于地面上。
Blind guide mark and installation method
The invention discloses a blind guide mark and an installation method and relates to the field of blind guide marks. The tail end of a column foot of the blind guide mark is connected with a bottom basin, the upper portion of the bottom basin and the lower portion of the mark form an annular space capable of containing resin, and the diameter of the bottom basin is more than one time larger than the diameter of the column foot or not smaller than half of the diameter of a mark body. According to the mounting method disclosed by the invention, the blind guide mark can be stably fixed on the ground only by drilling a wide and shallow hole in the surface of the ground material and injecting the resin without drilling tiles on the ground and drilling the back surface of the stone.
一种盲导标示及安装方法,涉及盲导标示领域。盲导标示,标示的柱脚末端连接一个底盆,底盆的上方与标示的下方形成可容纳树脂的环形空间,底盆的直径大于柱脚的直径一倍以上,或不少于标示本体直径的一半。本发明的安装方法,无需把地面上的砖瓦钻穿及钻透石材背面,只需在地材表面上钻一个宽和浅的孔洞,及注入树脂便能令盲导标示稳固于地面上。
Blind guide mark and installation method
盲导标示及安装方法
FENG JUNXIONG (author)
2023-02-24
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.