A platform for research: civil engineering, architecture and urbanism
Construction structure and reinforcing method of reinforced earth retaining wall
The invention provides a construction structure and reinforcing method of a reinforced soil retaining wall, the structure comprises an original slope body, a bidirectional geogrid, backfill soil, a precast concrete panel and a profile steel pile, and the construction method comprises the following steps: firstly, leveling the bottom of a filler area, completing foundation trench excavation, carrying out foundation pouring, installing the precast concrete panel, and carrying out construction; tensioning force is applied to the two-way geogrid with the rivets in advance through a winch, the two-way geogrid with the rivets is laid at the bottom of the filling area, the steps are repeated till the filling elevation is reached, then the profile steel piles are driven in, the top beam is poured, and finally the reinforced earth retaining wall structure which is high in construction quality and convenient to construct is formed.
本发明提供一种加筋土挡墙的施工结构与加固方法,其结构包括:原有坡体、双向土工格栅、回填土、预制混凝土面板、型钢桩,步骤是:首先将填料区底部整平,完成基槽开挖并进行基础浇筑,安装预制混凝土面板,采用卷扬机将带铆钉形式双向土工格栅事先施加张拉力,在填料区底部铺设带铆钉形式双向土工格栅,重复以上步骤直到填筑标高,再打入型钢桩并浇筑冠梁,最终形成一个施工质量高、施工便捷的加筋土挡墙结构。
Construction structure and reinforcing method of reinforced earth retaining wall
The invention provides a construction structure and reinforcing method of a reinforced soil retaining wall, the structure comprises an original slope body, a bidirectional geogrid, backfill soil, a precast concrete panel and a profile steel pile, and the construction method comprises the following steps: firstly, leveling the bottom of a filler area, completing foundation trench excavation, carrying out foundation pouring, installing the precast concrete panel, and carrying out construction; tensioning force is applied to the two-way geogrid with the rivets in advance through a winch, the two-way geogrid with the rivets is laid at the bottom of the filling area, the steps are repeated till the filling elevation is reached, then the profile steel piles are driven in, the top beam is poured, and finally the reinforced earth retaining wall structure which is high in construction quality and convenient to construct is formed.
本发明提供一种加筋土挡墙的施工结构与加固方法,其结构包括:原有坡体、双向土工格栅、回填土、预制混凝土面板、型钢桩,步骤是:首先将填料区底部整平,完成基槽开挖并进行基础浇筑,安装预制混凝土面板,采用卷扬机将带铆钉形式双向土工格栅事先施加张拉力,在填料区底部铺设带铆钉形式双向土工格栅,重复以上步骤直到填筑标高,再打入型钢桩并浇筑冠梁,最终形成一个施工质量高、施工便捷的加筋土挡墙结构。
Construction structure and reinforcing method of reinforced earth retaining wall
一种加筋土挡墙的施工结构与加固方法
ZHANG ZHICHAO (author) / ZHENG KEKE (author) / NIU TINGTING (author) / TANG XUEFENG (author) / GUO CHAOXU (author)
2023-03-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2019
|Reinforced earth retaining wall construction structure and construction method
European Patent Office | 2023
|European Patent Office | 2023
|