A platform for research: civil engineering, architecture and urbanism
Prefabricated wallboard secondary beam structure and construction technology
The invention discloses a prefabricated wallboard secondary beam structure and a construction technology, and belongs to the technical field of house building, the prefabricated wallboard secondary beam structure comprises a wallboard and a secondary beam, a notch is formed in the upper surface of the wallboard, the notch is matched with the secondary beam in size, and a flat pressing assembly is arranged on the inner wall of the wallboard; according to the device, by arranging the flat pressing assembly, in the process that the secondary beam is placed into the notch, the secondary beam can extrude a moving rod, the moving rod can move towards the interior of the wall plate during extrusion, at the moment, the moving rod can drive a stop block to move through a lifting rod, and when the stop block moves backwards, the stop block can also move downwards in a lifting groove; when the stop block loses the stop of the moving block, the extrusion spring pushes the pressing plate to one side of the wallboard through the moving block, so that the pressing plate tightly presses the secondary beam in the notch, a threaded hole in the reinforcing plate can be quickly aligned with a threaded hole in the wallboard, and meanwhile, the connectivity between the secondary beam and the wallboard is improved; and the stability between the wallboard and the secondary beam is further improved.
本发明公开了一种预制墙板次梁结构及施工工艺,属于房屋建筑技术领域,包括墙板与次梁,所述墙板的上表面设置有槽口,所述槽口与次梁的大小相互适配,所述墙板的内壁上设置有平压组件;本发明中,通过设置有平压组件,在次梁放入槽口的过程中,次梁会对移动杆进行挤压,移动杆在挤压时会往墙板的内部移动,此时移动杆会通过升降杆带动阻挡块发生位移,在阻挡块往后移动时也会在升降槽内向下移动,当阻挡块失去对移动块的阻挡时,挤压弹簧会通过移动块将压板往墙板的一侧推动,进而使压板将次梁紧紧的压在槽口内,可以快速的使加固板上的螺纹孔与墙板上的螺纹孔对准,同时提高次梁与墙板之间的连接性,进而提高墙板与次梁之间的稳定性。
Prefabricated wallboard secondary beam structure and construction technology
The invention discloses a prefabricated wallboard secondary beam structure and a construction technology, and belongs to the technical field of house building, the prefabricated wallboard secondary beam structure comprises a wallboard and a secondary beam, a notch is formed in the upper surface of the wallboard, the notch is matched with the secondary beam in size, and a flat pressing assembly is arranged on the inner wall of the wallboard; according to the device, by arranging the flat pressing assembly, in the process that the secondary beam is placed into the notch, the secondary beam can extrude a moving rod, the moving rod can move towards the interior of the wall plate during extrusion, at the moment, the moving rod can drive a stop block to move through a lifting rod, and when the stop block moves backwards, the stop block can also move downwards in a lifting groove; when the stop block loses the stop of the moving block, the extrusion spring pushes the pressing plate to one side of the wallboard through the moving block, so that the pressing plate tightly presses the secondary beam in the notch, a threaded hole in the reinforcing plate can be quickly aligned with a threaded hole in the wallboard, and meanwhile, the connectivity between the secondary beam and the wallboard is improved; and the stability between the wallboard and the secondary beam is further improved.
本发明公开了一种预制墙板次梁结构及施工工艺,属于房屋建筑技术领域,包括墙板与次梁,所述墙板的上表面设置有槽口,所述槽口与次梁的大小相互适配,所述墙板的内壁上设置有平压组件;本发明中,通过设置有平压组件,在次梁放入槽口的过程中,次梁会对移动杆进行挤压,移动杆在挤压时会往墙板的内部移动,此时移动杆会通过升降杆带动阻挡块发生位移,在阻挡块往后移动时也会在升降槽内向下移动,当阻挡块失去对移动块的阻挡时,挤压弹簧会通过移动块将压板往墙板的一侧推动,进而使压板将次梁紧紧的压在槽口内,可以快速的使加固板上的螺纹孔与墙板上的螺纹孔对准,同时提高次梁与墙板之间的连接性,进而提高墙板与次梁之间的稳定性。
Prefabricated wallboard secondary beam structure and construction technology
一种预制墙板次梁结构及施工工艺
LU BIN (author) / ZHU HUANJIE (author) / ZHAO BIN (author) / ZHOU XIAOHUA (author) / YU YINGFENG (author)
2023-03-03
Patent
Electronic Resource
Chinese
Prefabricated wallboard, wallboard system and construction method of wallboard system
European Patent Office | 2022
|Prefabricated building prefabricated wallboard structure
European Patent Office | 2023
|Fabricated concrete prefabricated wallboard and construction technology
European Patent Office | 2024
|European Patent Office | 2016
|