A platform for research: civil engineering, architecture and urbanism
Indoor wall tile dry hanging construction process
The invention discloses a dry hanging construction process for indoor wall tiles. The dry hanging construction process comprises the following steps: step 1, precise design; 2, checking and accepting the materials; step 3, preparing a base layer; step 4, positioning and mounting; the steel wire mesh and the connecting piece are welded and fixed after being positioned, a welding seam is coated with antirust paint, the connecting piece is cut and leveled, a reinforcing gasket is installed between the steel wire mesh and the wall, and the reinforcing gasket and the steel wire mesh are fixed through a nail gun; step 6, mounting a bottom support; 7, hanging piece installation; 8, a bottom plate is installed; ninthly, a panel is installed; step 10, mounting a top plate; and step 11, sealing and caulking. The mesh with the standard size is adopted, so that construction is more convenient, the special hanging piece and the wall tile are accurately assembled, cost is saved, and efficiency is improved; the problems of large maintenance difficulty and high cost after the wall tiles are damaged are solved, and compared with the prior art, the structure saves the space by about 50%, and the usable area is increased.
本发明公开了一种室内墙面砖干挂施工工艺,包括如下步骤:步骤1、精准设计;步骤2、材料验收;步骤3、基层准备;步骤4、定位安装;步骤5、网片铺装:将钢丝网片与连接件定位后焊接固定,对焊缝涂防锈漆处理,对连接件进行切割找平处理,在钢丝网片与墙体之间安装加固垫片,通过钉枪将加固垫片与钢丝网片固定;步骤6、底托安装;步骤7、挂件安装;步骤8、底板安装;步骤9、面板安装;步骤10、顶板安装;步骤11、密封填缝。本发明采用尺寸标准的网片使施工更便捷,配合专用挂件与墙面砖精准装配,节约成本提高效率;解决了墙面砖破损后维修难度大、成本高的问题,与现有工艺相比,结构节约空间近50%,增大了使用面积。
Indoor wall tile dry hanging construction process
The invention discloses a dry hanging construction process for indoor wall tiles. The dry hanging construction process comprises the following steps: step 1, precise design; 2, checking and accepting the materials; step 3, preparing a base layer; step 4, positioning and mounting; the steel wire mesh and the connecting piece are welded and fixed after being positioned, a welding seam is coated with antirust paint, the connecting piece is cut and leveled, a reinforcing gasket is installed between the steel wire mesh and the wall, and the reinforcing gasket and the steel wire mesh are fixed through a nail gun; step 6, mounting a bottom support; 7, hanging piece installation; 8, a bottom plate is installed; ninthly, a panel is installed; step 10, mounting a top plate; and step 11, sealing and caulking. The mesh with the standard size is adopted, so that construction is more convenient, the special hanging piece and the wall tile are accurately assembled, cost is saved, and efficiency is improved; the problems of large maintenance difficulty and high cost after the wall tiles are damaged are solved, and compared with the prior art, the structure saves the space by about 50%, and the usable area is increased.
本发明公开了一种室内墙面砖干挂施工工艺,包括如下步骤:步骤1、精准设计;步骤2、材料验收;步骤3、基层准备;步骤4、定位安装;步骤5、网片铺装:将钢丝网片与连接件定位后焊接固定,对焊缝涂防锈漆处理,对连接件进行切割找平处理,在钢丝网片与墙体之间安装加固垫片,通过钉枪将加固垫片与钢丝网片固定;步骤6、底托安装;步骤7、挂件安装;步骤8、底板安装;步骤9、面板安装;步骤10、顶板安装;步骤11、密封填缝。本发明采用尺寸标准的网片使施工更便捷,配合专用挂件与墙面砖精准装配,节约成本提高效率;解决了墙面砖破损后维修难度大、成本高的问题,与现有工艺相比,结构节约空间近50%,增大了使用面积。
Indoor wall tile dry hanging construction process
一种室内墙面砖干挂施工工艺
LI BIN (author) / QIAN WENTIAN (author)
2023-03-03
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Indoor ceramic tile dry hanging wall surface structure and dry hanging process thereof
European Patent Office | 2023
|Indoor wall tile dry hanging assembly and application method thereof
European Patent Office | 2021
|Assembly type wall tile process convenient for dry hanging
European Patent Office | 2022
|Environment-friendly wall tile dry hanging structure and construction method thereof
European Patent Office | 2020
|Special landscape wall stone-grain-imitated polished tile dry hanging construction technology
European Patent Office | 2020
|