Curb construction method
The invention discloses a curb construction method which comprises the following steps: S1, surveying and lofting: accurately paying off and nailing a pile according to a design side line, and measuring a curb side line and a construction elevation; s2, curb foundation supports are built, specifically, the curb foundation supports are built at the two ends of the curbs according to measurement control lines, 2cm is reserved for mortar leveling, when the curb foundation supports are built, every two adjacent curbs share one supporting pier according to the length of the curbs, the curbs are laid with dry hard mortar with the thickness of 1-2cm, and the curbs are laid with the dry hard mortar with the thickness of 1-2cm; s3, adjusting the line type and the flatness of the curb; s4, checking and accepting the line type and the flatness of the curb; s5, formwork erecting and concrete pouring are conducted, specifically, after it is guaranteed that the curb is smooth, formwork erecting is conducted on the two sides of the curb, formwork erecting height is constructed according to the designed height, firm reinforcement is conducted, concrete pouring is conducted after a formwork is accepted and accepted to be qualified, and a front backrest, a rear backrest and a curb foundation are manufactured; and S6, performing concrete curing for not less than 7 days. The construction quality can be improved, and the construction period can be shortened.
本发明公开了一种路缘石施工方法,包括有如下步骤:S1.测量放样:按设计边线准确地放线钉桩,测量路缘石边线和施工标高;S2.砌筑路缘石基础支撑:在路缘石两端根据测量控制线进行砌筑路缘石基础支撑,预留2cm进行砂浆找平,砌筑路缘石基础支撑时按照路缘石长度,使每相邻两块路缘石共用一个支撑墩,路缘石以1‑2cm厚度的干硬性砂浆铺砌,S3.调整路缘石线型及平整度;S4.验收路缘石线型及平整度;S5.支模浇筑混凝土:确保路缘石平顺后,对路缘石两侧进行支模,支模高度按照设计高度施工,并加固牢靠,验收模板合格后进行混凝土浇筑,制作前后靠背及路缘石基础;S6.进行不少于7天的混凝土养生。本发明可以提高施工的质量、缩短施工的周期。
Curb construction method
The invention discloses a curb construction method which comprises the following steps: S1, surveying and lofting: accurately paying off and nailing a pile according to a design side line, and measuring a curb side line and a construction elevation; s2, curb foundation supports are built, specifically, the curb foundation supports are built at the two ends of the curbs according to measurement control lines, 2cm is reserved for mortar leveling, when the curb foundation supports are built, every two adjacent curbs share one supporting pier according to the length of the curbs, the curbs are laid with dry hard mortar with the thickness of 1-2cm, and the curbs are laid with the dry hard mortar with the thickness of 1-2cm; s3, adjusting the line type and the flatness of the curb; s4, checking and accepting the line type and the flatness of the curb; s5, formwork erecting and concrete pouring are conducted, specifically, after it is guaranteed that the curb is smooth, formwork erecting is conducted on the two sides of the curb, formwork erecting height is constructed according to the designed height, firm reinforcement is conducted, concrete pouring is conducted after a formwork is accepted and accepted to be qualified, and a front backrest, a rear backrest and a curb foundation are manufactured; and S6, performing concrete curing for not less than 7 days. The construction quality can be improved, and the construction period can be shortened.
本发明公开了一种路缘石施工方法,包括有如下步骤:S1.测量放样:按设计边线准确地放线钉桩,测量路缘石边线和施工标高;S2.砌筑路缘石基础支撑:在路缘石两端根据测量控制线进行砌筑路缘石基础支撑,预留2cm进行砂浆找平,砌筑路缘石基础支撑时按照路缘石长度,使每相邻两块路缘石共用一个支撑墩,路缘石以1‑2cm厚度的干硬性砂浆铺砌,S3.调整路缘石线型及平整度;S4.验收路缘石线型及平整度;S5.支模浇筑混凝土:确保路缘石平顺后,对路缘石两侧进行支模,支模高度按照设计高度施工,并加固牢靠,验收模板合格后进行混凝土浇筑,制作前后靠背及路缘石基础;S6.进行不少于7天的混凝土养生。本发明可以提高施工的质量、缩短施工的周期。
Curb construction method
一种路缘石施工方法
TIAN ZHEN (author) / SHA KEFEI (author) / GUO RUIJIAO (author) / LIANG JUN (author) / QIAO WENGUO (author) / GAO FENG (author) / BAI YUNLONG (author) / LI JIA (author) / SHI YANJING (author) / WANG LIUJUN (author)
2023-03-07
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
CONCRETE CURB, CURB STRUCTURE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2016
|Curb suspension mounting device and curb cushion reverse construction method
European Patent Office | 2022
|Curb, curb overall cast-in-place mold, control method and construction method
European Patent Office | 2015
|