Dismantling method of temporary iron building
The invention relates to a demolition method for an iron-adjacent building, which comprises the following steps that a protective net arranged outside the iron-adjacent building in a surrounding manner is built, so that the iron-adjacent building is separated from a railway track by the protective net, the top of the protective net is not lower than the top of the iron-adjacent building, and a hoisting hole is defined by the top of the protective net; cutting the temporary iron building into a plurality of unit blocks; and gradually hoisting the unit blocks to a demolition storage area from the hoisting holes. According to the dismantling method for the temporary iron building, dismantling of the temporary iron building can be completed under railway operation, the dismantling construction efficiency is improved, the temporary iron building is cut to form unit blocks for hoisting, the hoisting weight of each time is reduced, the hoisting difficulty is reduced, and the safety of dismantling work is improved.
本发明涉及一种临铁建筑的拆除方法,其包括以下步骤:搭建围设于临铁建筑外的防护网,使所述防护网将所述临铁建筑与铁路轨道隔离开,其中,防护网的顶部不低于所述临铁建筑的顶部,且所述防护网的顶部围成吊装孔;将临铁建筑切割成若干单元块;逐步将所述单元块由吊装孔吊装至拆除存放区。本发明实施例提供的一种临铁建筑的拆除方法,可以在铁路运行下完成临铁建筑的拆除,提高了拆除施工的效率,通过将临铁建筑切割形成单元块吊装,降低了每次吊装的重量,降低了吊装的难度,提高了拆除工作的安全性。
Dismantling method of temporary iron building
The invention relates to a demolition method for an iron-adjacent building, which comprises the following steps that a protective net arranged outside the iron-adjacent building in a surrounding manner is built, so that the iron-adjacent building is separated from a railway track by the protective net, the top of the protective net is not lower than the top of the iron-adjacent building, and a hoisting hole is defined by the top of the protective net; cutting the temporary iron building into a plurality of unit blocks; and gradually hoisting the unit blocks to a demolition storage area from the hoisting holes. According to the dismantling method for the temporary iron building, dismantling of the temporary iron building can be completed under railway operation, the dismantling construction efficiency is improved, the temporary iron building is cut to form unit blocks for hoisting, the hoisting weight of each time is reduced, the hoisting difficulty is reduced, and the safety of dismantling work is improved.
本发明涉及一种临铁建筑的拆除方法,其包括以下步骤:搭建围设于临铁建筑外的防护网,使所述防护网将所述临铁建筑与铁路轨道隔离开,其中,防护网的顶部不低于所述临铁建筑的顶部,且所述防护网的顶部围成吊装孔;将临铁建筑切割成若干单元块;逐步将所述单元块由吊装孔吊装至拆除存放区。本发明实施例提供的一种临铁建筑的拆除方法,可以在铁路运行下完成临铁建筑的拆除,提高了拆除施工的效率,通过将临铁建筑切割形成单元块吊装,降低了每次吊装的重量,降低了吊装的难度,提高了拆除工作的安全性。
Dismantling method of temporary iron building
一种临铁建筑的拆除方法
WU CHENGFENG (author) / YI WEIPING (author) / WANG YALONG (author) / WEN JIE (author) / SHEN GUOJUN (author) / LIN BAICHENG (author) / GUO WEI (author) / YI JUNFENG (author) / YANG YINGZHOU (author) / PENG CHENG (author)
2023-03-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Temporary support for dismantling urban viaduct in complex environment and dismantling method
European Patent Office | 2024
|Building facade dismantling device and dismantling method
European Patent Office | 2024
|Cantilever steel structure construction temporary support dismantling method
European Patent Office | 2023
|