Bridge concrete leveling layer elevation control device
The invention discloses a bridge concrete leveling layer elevation control device which comprises a first bottom plate and a second bottom plate which are the same in structure and connected to form an included angle, and the connecting included angle is adjustable. At least two pulleys are arranged at the upper part of the outer side surface of the side baffle; a middle baffle is arranged between the two front baffles; one end of the operating rod is connected with the first bottom plate and the second bottom plate, and the other end of the operating rod inclines towards the side provided with the front baffle; according to the construction requirements of a construction bridge, the first bottom plate and the second bottom plate are adjusted to proper angles in advance and cover concrete of the bridge floor, the baffles on the two sides are attached to the ground cloth, the pulleys arranged on the two sides are arranged on the ground cloth, and elevation control over the concrete of the bridge floor is completed by pulling the operation rod; and meanwhile, the bridge floor concrete can be troweled with a gradient, operation is easy and fast, and the construction efficiency is improved.
本发明公开了一种桥梁混凝土找平层标高控制装置,包括:结构相同的第一底板与第二底板,二者连接形成夹角,且连接夹角角度可调;侧挡板,所述侧挡板外侧面上部至少设有两个滑轮;前挡板,两个所述前挡板之间设置有中置挡板;操作杆,一端与第一底板和第二底板连接,另一端朝向设置有前挡板的一侧倾斜设置;本发明中,提前根据施工桥梁的建设需求,将第一底板和第二底板调节至合适的角度,并将其覆盖于桥面的混凝土上,两侧挡板与地袱贴合,两侧设置的滑轮置于地袱上,通过拉动操作杆,完成对桥面混凝土的标高控制,同时也能对桥面混凝土进行具有坡度的抹平,操作简单快捷,提高了施工效率。
Bridge concrete leveling layer elevation control device
The invention discloses a bridge concrete leveling layer elevation control device which comprises a first bottom plate and a second bottom plate which are the same in structure and connected to form an included angle, and the connecting included angle is adjustable. At least two pulleys are arranged at the upper part of the outer side surface of the side baffle; a middle baffle is arranged between the two front baffles; one end of the operating rod is connected with the first bottom plate and the second bottom plate, and the other end of the operating rod inclines towards the side provided with the front baffle; according to the construction requirements of a construction bridge, the first bottom plate and the second bottom plate are adjusted to proper angles in advance and cover concrete of the bridge floor, the baffles on the two sides are attached to the ground cloth, the pulleys arranged on the two sides are arranged on the ground cloth, and elevation control over the concrete of the bridge floor is completed by pulling the operation rod; and meanwhile, the bridge floor concrete can be troweled with a gradient, operation is easy and fast, and the construction efficiency is improved.
本发明公开了一种桥梁混凝土找平层标高控制装置,包括:结构相同的第一底板与第二底板,二者连接形成夹角,且连接夹角角度可调;侧挡板,所述侧挡板外侧面上部至少设有两个滑轮;前挡板,两个所述前挡板之间设置有中置挡板;操作杆,一端与第一底板和第二底板连接,另一端朝向设置有前挡板的一侧倾斜设置;本发明中,提前根据施工桥梁的建设需求,将第一底板和第二底板调节至合适的角度,并将其覆盖于桥面的混凝土上,两侧挡板与地袱贴合,两侧设置的滑轮置于地袱上,通过拉动操作杆,完成对桥面混凝土的标高控制,同时也能对桥面混凝土进行具有坡度的抹平,操作简单快捷,提高了施工效率。
Bridge concrete leveling layer elevation control device
一种桥梁混凝土找平层标高控制装置
LIU SHIYAN (author) / NIE KENI (author) / SUN TAO (author) / ZENG XIYUAN (author) / ZHOU JIANJUN (author) / YU ZEQIANG (author) / CHEN YANG (author)
2023-03-10
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2020
|Cast-in-place concrete guardrail template bottom elevation leveling adjusting device
European Patent Office | 2023
|Portable bridge handrail concrete pouring and leveling device
European Patent Office | 2022
|Bridge deck pavement leveling layer structure and leveling method thereof
European Patent Office | 2015
|